ELE17-01661
| Electrical Rough-In | 6/7/2017 | 6/8/2017 | 6/8/2017 2:47:58 PM | P | CANC |
|
|
Please call prior to coming to site. Power Disconnect is scheduled for 1-2pm for a Panel Upgrade so later in the afternoon is best. Phone #: ###-#### Inspection requested via web by Christian Kilpatrick...
needed perm service added to inspection...fee needs to be increased as well by final
|
ELE17-01661
| Rough-In Permanent Service | 6/8/2017 | 6/8/2017 | 6/8/2017 2:45:50 PM | P | PASS |
|
|
Please call prior to coming to site. Power Disconnect is scheduled for 1-2pm for a Panel Upgrade so later in the afternoon is best. Phone #: ###-#### Inspection requested via web by Christian Kilpatrick...
permit fee needs to be increased to include service change by final rough inspection of solar ok p/s u/g rec ok
|
ELE17-01784
| Conference | 6/8/2017 | 6/8/2017 | 6/8/2017 1:58:46 PM | P | PASS |
|
|
Lester Phone #: ###-####...
discussed what needed to set service to have power to run irrigation pump...post, grounding, clearance around services, sch 80 vs 40 pipe, length and number of ground rods
|
ELE17-01439
| Final | 6/8/2017 | 6/8/2017 | 6/8/2017 12:51:44 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Chesnut...
ok to final
|
ELE17-00099
| Final | 6/7/2017 | 6/8/2017 | 6/8/2017 12:30:30 PM | P | FAIL |
|
|
please inspect after 9;30 am Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON
1) available fault current labelling on service 2) outside panels need labelled completely... front and back panels 3) outlet below outside panel shows hot neutral reverse 4) service shall have a intersystem bond bar 5) access to roof units needed to verify labelling, disconnects, breaker size, service outlet, etc. contractor will provide a sturdy ladder or sometime of means for access to roof
|
ELE17-01775
| Rough-In Permanent Service | 6/7/2017 | 6/8/2017 | 6/8/2017 11:14:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald...
rough ok to cover p/s u/g n ok
|
ELE17-01767
| Final | 6/7/2017 | 6/8/2017 | 6/8/2017 10:41:15 AM | A | FAIL |
|
|
Call 20 mins before // Becky Phone #: ###-####....
1) outlets in bathrooms shall be GFI protected 2) heated tile floor shall have GFI protection and needs to be on own circuit...based on power draw
|
ELE17-01621
| Final | 6/7/2017 | 6/8/2017 | 6/8/2017 9:59:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Seth Stears...
labelling done...ok to final...no access to apply final sticker on panel
|
ELE17-01674
| Electrical Rough-In | 6/7/2017 | 6/8/2017 | 6/8/2017 9:37:08 AM | A | FAIL |
|
|
Call an hour in advanced if you would like the electrician on site. Phone #: ###-#### Inspection requested via web by Christian Kilpatrick...
not all equipment being installed on job site...rails and combiner box but no panels installed...unable to verify listing...tried to make contact with phone number given and could not reach or leave message
|
ELE17-01628
| Electrical Rough-In | 6/7/2017 | 6/8/2017 | 6/8/2017 9:37:08 AM | A | PASS |
|
|
Please call Kyle at ###-#### for any questions. Lott Electric INC Phone #: ###-#### Inspection requested via web by Kyle Lott..
rough in ok to cover walls only
|
ELE17-01700
| Rough-In Permanent Service | 6/7/2017 | 6/8/2017 | 6/8/2017 8:38:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn...
rough ok to cover p/s u/g n ok
|
ELE16-01302
| Final | 6/7/2017 | 6/8/2017 | 6/7/2017 3:49:18 PM | A | CANC |
|
|
Justin Hamby Phone #: ###-#### >> Inspection requested via web by Laurie Hoelscher Inspection cancelled from web by: Laurie Hoelscher
|
ELE17-01674
| Electrical Rough-In | 6/7/2017 | 6/8/2017 | 6/7/2017 1:22:04 PM | A | CANC |
|
|
Call an hour in advance if you would like the electrician there Phone #: ###-#### >> Inspection requested via web by Christian Kilpatrick Inspection cancelled from web by: Christian Kilpatrick
|