PLM16-04590
| Final | 6/8/2017 | 6/8/2017 | 6/8/2017 2:41:35 PM | P | PASS |
|
|
Contractor never called in the water service connection for inspection. Meter test doesn't show any leaks.
|
PLM17-02050
| Groundwork | 6/7/2017 | 6/8/2017 | 6/8/2017 6:25:37 AM | A | PASS |
|
|
We are requesting a groundwork inspection at 6am from Dan Ediger. Contact Andy Sifford : ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel. Permit finaled.
|
PLM17-02050
| Final | 6/8/2017 | 6/8/2017 | 6/8/2017 6:25:10 AM | A | PASS |
|
|
We are requesting a groundwork inspection at 6am from Dan Ediger. Contact Andy Sifford : ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel. Main drain from unit 110 was taken off the grease line from unit 950 (Blimpies) into the main building drain. A flush test was done to verify the grease line is now only on Blimpies and no sewage flows into the grease line.
|
PLM17-01451
| Final | 6/7/2017 | 6/8/2017 | 6/7/2017 4:41:43 PM | A | PASS |
|
|
Jerry Phone #: ###-####
|
PLM16-03798
| Final | 6/6/2017 | 6/8/2017 | 6/7/2017 4:23:05 PM | A | PASS |
|
|
Request around 9AM, please call 30min to meet - Dale Phone #: ###-####. Final house connections. Existing fixtures
|
PLM17-02042
| Plumbing Rough-in | 6/7/2017 | 6/8/2017 | 6/7/2017 4:05:49 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Tom Maxwell
|
PLM17-00915
| Water and/or Sewer | 6/7/2017 | 6/8/2017 | 6/7/2017 2:46:12 PM | A | PASS |
|
|
Inspection requested via web by steven smith
|