Inspections for the day of: Monday, June 8, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-01575 FIRE-Final Inspection6/8/20206/8/20206/8/2020 3:58:06 PMPFAIL
Need plans and small documents, need fire extinguishers upstairs and down, need to repair exit sign in warehouse, need single action hardware on doors.screened // Evan Phone #: ###-####
FIR20-00074 INSP-Final Inspection6/8/20206/8/20206/8/2020 3:56:56 PMPPART
Phase 2 sprinkler work is complete.

Please Contact Rick Fry for final Inspection. This final is for phase 2 only. Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR19-00949 INSP-Final Inspection6/8/20206/8/20206/8/2020 3:56:12 PMPPASS
Permit finaled

Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR20-00142 INSP-Final Inspection6/4/20206/8/20206/8/2020 2:52:45 PMPFAIL
The smoke detectors need to be centered on the doors as per NFPA 72 (door release). Also care needs to be taken on the air grill as discussed. No testing performed.

Kc Strykowski, Tech Phone #: ###-#### Inspection requested via web by John Siewert
FIR19-00888 INSP-Sprinkler Rough-in6/8/20206/8/20206/8/2020 2:50:55 PMPPART
I gave the ok to cover on the remaining underground piping except for the two east most thrust blocks. These two thrust blocks have pulled/fallen away from the underground supply piping and will need to be repoured, re-inspected, prior to an ok for cover.

Bryan Collins is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00949 INSP-Final Inspection6/8/20206/8/20206/8/2020 12:46:48 PMAPASS
Forward flush passed. Permit finaled.

JON IS OUR FOREMAN ON SITE Phone #: ###-#### Inspection requested via web by Brad Bettencourt
FIR20-00148 INSP-Final Inspection6/5/20206/8/20206/8/2020 12:37:45 PMPCANC
To be rescheduled per Jeremiah.

Looking to final after hydro at some point in the day. Phone #: ###-#### Inspection requested via web by jeremiah robison
FIR20-00148 INSP-Sprinkler Rough-in/Hydro6/5/20206/8/20206/8/2020 12:32:27 PMAPASS
Over head Hydro witnessed with no pressure loss and the remote FDC piping has been coated and wrapped. It is ok to bury.

Phone #: ###-#### Inspection requested via web by jeremiah robison
FIR20-00113 INSP-Final Inspection6/7/20206/8/20206/8/2020 10:55:26 AMAFAIL
All items corrected except we still need to test the duct smoke detectors and get paper work for a final.

Buck Tom Phone #: ###-#### Inspection requested via web by Ken Webster
FIR20-00115 INSP-Final Inspection6/5/20206/8/20206/8/2020 10:54:55 AMPCANC
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa Inspection cancelled via mobile web on Monday, June 08, 2020.
BLD18-02566 FIRE-Final Inspection6/5/20206/8/20206/8/2020 10:15:57 AMAFAIL
Provide emergency lighting, provide fire extinguisher, provide fire sprinkler protection for canopies due to the presence of the fire pit, provide approved hardware/hinge for the gate as discussed, provide signage at the gas valves as discussed.

Ed *screened* Phone #: ###-####