Inspections for the day of: Monday, June 9, 2003.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC03-00553 Site Preparation6/6/20036/9/20036/9/2003 12:00:00 AMAPART
Verbal to RP-G. Lasher ###-####. Sweep and remove sediment from curb/street/sidewalk. 6/9/2003 1:29:29 PM
ESC02-00529 Site Preparation6/6/20036/9/20036/9/2003 12:00:00 AMAFAIL
Need cleanup of sand on driveway or install bmp to prevent washing into street during next rain event. Will follow-up. 6/9/2003 1:31:05 PM
ESC03-00334 Conference6/9/20036/9/20036/9/2003 12:00:00 AMADONE
JLR AND SGW meet with Mr. Evans, (de-watering contractor). Reviewed water quality requirement for offsite discharge. Currently water quality is of acceptable standards for offsite discharge into wetlands. Land use application is currently being utilized to clean sediment from water. Discussed with Mr. Evans water quality requirements if settling ponds are utilized. 6/9/2003 9:47:42 AM