ESC04-00601
| Site Preparation | 6/9/2004 | 6/9/2004 | 6/9/2004 12:00:00 AM | A | PASS |
|
|
|
ESC04-00119
| Site Preparation | 6/9/2004 | 6/9/2004 | 6/9/2004 12:00:00 AM | A | PART |
|
|
Most items ok, sweep daily or as needed. 6/9/2004 12:42:32 PM
|
ESC04-00726
| Site Preparation | 6/9/2004 | 6/9/2004 | 6/9/2004 12:00:00 AM | A | FAIL |
|
|
andy ###-#### ESC permit has not been picked up, permit clerks informed me that the church and the rp was notified that permit is ready on the 7th. Called rp, informed him via voice mail that the permit needs to be picked up prior to the end of this week and for plan to be implemented by the end of the weekend. Will follow up, stop work can be issued if above timeframe is not met. 6/9/2004 8:52:42 AM
|
ESC04-00464
| Site Preparation | 6/9/2004 | 6/9/2004 | 6/9/2004 12:00:00 AM | P | FAIL |
|
|
Issued correction noitice to rp. No bmp's in place nor is required signage posted. This permit is a general permit, but construction entrance is needed to prevent trackout from job site onto Boise Avenue. Completed by the end of the weekend or a stop work can be issued. Will follow up. 6/10/2004 2:21:47 PM
|