BLD05-01274
| BLD-Final | 6/6/2005 | 6/7/2005 | | A | |
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 10:41:09 AM. Contact: ###-####.
|
BLD05-00480
| BLD-Final | 6/9/2005 | 6/9/2005 | 6/10/2005 10:21:03 AM | P | NR |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD05-00287
| BLD-Framing/Rough-in | 6/9/2005 | 6/9/2005 | 6/10/2005 9:21:30 AM | P | PART |
|
|
dominick--partial r/i; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover entry ways
|
BLD05-00910
| BLD-Framing/Rough-in | 6/8/2005 | 6/9/2005 | 6/9/2005 3:57:44 PM | P | FAIL |
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moorec/n on site ok to insulate
|
BLD05-00600
| BLD-Final | 6/8/2005 | 6/9/2005 | 6/9/2005 12:43:53 PM | P | NR |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need Plumb and fire sign off.... Electr now signed Temp. Mech pass.
|
BLD04-01705
| BLD-Final | 6/9/2005 | 6/9/2005 | 6/9/2005 10:38:41 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/9/2005 at 8:17:49 AM. Contact: ###-####. ok for l/c
|
BLD05-00597
| BLD-Final | 6/8/2005 | 6/9/2005 | 6/9/2005 10:37:29 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/8/2005 at 9:22:59 AM. Contact: ###-####. evrey thing ok but needs sprk and L/F Finals
|
BLD04-01323
| BLD-Framing/Rough-in | 6/8/2005 | 6/9/2005 | 6/9/2005 10:34:48 AM | A | PART |
|
|
Fire safing inspection. Call Paul ###-####. I tried to schedule this today but had a block on our permit. Paul needs this looked at first thing if possible. Thanks..alexmonge ok to coverInternet Inspection Request from: Alex Monge
|
BLD05-00493
| BLD-Footing | 6/8/2005 | 6/9/2005 | 6/8/2005 3:36:09 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 6/8/2005 at 9:36:05 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 8 2005 3:36PM.
|