ELE06-00339
| Final | 6/9/2006 | 6/9/2006 | 6/9/2006 4:18:48 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Danette Brookshire corr made, ok to final
|
ELE06-02128
| Electrical Rough-In | 6/9/2006 | 6/9/2006 | 6/9/2006 3:50:00 PM | P | PASS |
|
|
george - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called contr, left survey, 300.4(A)&(B) edge of holes and nm cable shall be 1 1/4" from edge of framing member,210.52(A)(1) recpts shall be installed so that no point along floor line in wall space is more than 6' from a recpt outlet (by fireplace), ric ok
|
ELE06-02108
| Final | 6/9/2006 | 6/9/2006 | 6/9/2006 3:24:34 PM | P | NR |
|
|
Jeremiah, late afternoon; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt met owner, wrong panel height, no grounding, wrong meter base, said he would call Monday
|
ELE06-00671
| Electrical Rough-In | 6/9/2006 | 6/9/2006 | 6/9/2006 2:20:30 PM | P | PASS |
|
|
tye-cell# ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to pour mcc area
|
ELE06-02129
| Permanent Service | 6/9/2006 | 6/9/2006 | 6/9/2006 12:15:21 PM | P | PASS |
|
|
glen-- ###-#### p/s u/g rec ok
|
ELE06-02106
| Final | 6/9/2006 | 6/9/2006 | 6/9/2006 11:58:07 AM | P | PASS |
|
|
ok to final
|
ELE06-02106
| Permanent Service | 6/9/2006 | 6/9/2006 | 6/9/2006 11:57:29 AM | P | PASS |
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley corr made, p/s o/h n ok
|
ELE06-01213
| Final | 6/8/2006 | 6/9/2006 | 6/9/2006 11:02:27 AM | A | PASS |
|
|
Customer would prefer before 11 am to avoid lunch rush.; Phone #: ###-#### Internet Inspection Request from: Tawnya McKinney called contr to label panels rest ok, told to check light count, ok to final
|
ELE06-01953
| Electrical Rough-In | 6/8/2006 | 6/9/2006 | 6/9/2006 10:17:53 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 6/8/2006 at 12:37:37 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 9 2006 10:17AM.
|
ELE06-02039
| Final | 6/8/2006 | 6/9/2006 | 6/9/2006 10:09:14 AM | A | PASS |
|
|
roy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to final
|
ELE06-02039
| Permanent Service | 6/9/2006 | 6/9/2006 | 6/9/2006 10:08:50 AM | A | PASS |
|
|
roy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie p/s, exst meter, n, ok
|
ELE06-02099
| Temporary Service | 6/9/2006 | 6/9/2006 | 6/9/2006 9:35:03 AM | A | PASS |
|
|
corr made, t/s u/g n ok
|
ELE05-03209
| Electrical Rough-In | 6/7/2006 | 6/9/2006 | 6/9/2006 9:24:05 AM | A | FAIL |
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles met owner, nec 300.4(A)&(D) 1 1/4" for holes and nm cable shall be maintained,210.70(A)(2) shall install light by door,250.32(B)(1) shall install grounding,BCC all make-up shall be done
|
ELE06-01922
| Final | 6/8/2006 | 6/9/2006 | 6/9/2006 8:41:00 AM | A | FAIL |
|
|
jerry - swimming pool bonding; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called contr, left message, wrong type inspection request, no chairs set, said to call when ready
|
ELE06-02088
| Rough-In Permanent Service | 6/7/2006 | 6/9/2006 | 6/9/2006 8:18:00 AM | A | FAIL |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called contr, left corr notice, nec 334.30 nm cable shall be supported within 12" of box (lv), 352.30(A) rnc shall be supported within 3' of box (lv), 210.52(A)(1) recpts shall be installed such that no point is over 6' from recpt outlet,210.52(A)(2) recpt shall be in 2' wall space by dr,BCC all make-up shall be done,approved set of plans shall be on job
|
ELE06-00790
| Final | 6/8/2006 | 6/9/2006 | 6/8/2006 10:46:45 AM | A | CANC |
|
|
Re-insp. Call Mike w/ Doherty @ ###-#### for questions. Scheduled by Heather w/ Doherty.; Phone #: ###-#### Internet Inspection Request from: Heather Packer Inspection cancelled from web by: Heather Packer
|