ESC08-00470
| Site Preparation | 6/2/2008 | 6/9/2008 | 6/10/2008 11:01:36 AM | A | CANC |
|
|
|
ESC08-00178
| Tracking Control | 6/6/2008 | 6/9/2008 | 6/10/2008 8:34:28 AM | A | PASS |
|
|
A proper construction entrance has been installed off of 13 th street. CAS #460
|
ESC08-00492
| Site Final | 6/9/2008 | 6/9/2008 | 6/9/2008 3:03:10 PM | P | PASS |
|
|
Due to the start date of verical construction the lot does not need tro be stabilized. PASS CAS #460
|
ESC08-00469
| Site Preparation | 6/2/2008 | 6/9/2008 | 6/9/2008 1:54:11 PM | A | NR |
|
|
Have not started and left a message with RP . CAS #460
|
ESC08-00401
| BMP Violation | 6/6/2008 | 6/9/2008 | 6/9/2008 1:51:53 PM | P | FAIL |
|
|
ESC signs not posted at front of lot. No sediment bmps inforn of lot where the grade is more than 2%. Sediment on sidewalks and gutterpan. No drain inlet protection on storm drain to the north of lot. Will re-inspect on 6/10/08 in the AM to meet with RP with issues pertaining with lot. CAS #460
|
ESC08-00196
| BMP Violation | 6/6/2008 | 6/9/2008 | 6/9/2008 1:50:58 PM | P | FAIL |
|
|
ESC signs not posted at front of lot. No sediment bmps inforn of lot where the grade is more than 2%. Sediment on sidewalks and gutterpan. No drain inlet protection on storm drain to the north of lot. Will re-inspect on 6/10/08 in the AM to meet with RP with issues pertaining with lot. CAS #460
|
ESC06-00711
| BMP Violation | 6/6/2008 | 6/9/2008 | 6/9/2008 1:21:41 PM | A | PART |
|
|
Drains have been protect but still a heavy amount of sediment on the parking lot and coming from the adjacent property to the east of them. Left a message for RP to contact me. CAS #460
|
ESC07-01312
| Site Final | 6/5/2008 | 6/9/2008 | 6/9/2008 1:14:06 PM | P | NR |
|
|
Sediment catch in D.I. still at front of lots. CAS #460
|
ESC07-01313
| Site Final | 6/5/2008 | 6/9/2008 | 6/9/2008 1:13:46 PM | P | NR |
|
|
Sediment catch in D.I. still at front of lots. CAS #460
|
ESC07-01314
| Site Final | 6/5/2008 | 6/9/2008 | 6/9/2008 1:13:29 PM | P | NR |
|
|
Sediment catch in D.I. still at front of lots. CAS #460
|
ESC07-01315
| Site Final | 6/5/2008 | 6/9/2008 | 6/9/2008 1:13:00 PM | P | NR |
|
|
sediment catch in D.I. still at front of lots. CAS #460
|
ESC08-00461
| Site Preparation | 6/2/2008 | 6/9/2008 | 6/9/2008 1:08:38 PM | A | NR |
|
|
Left a message with RP to do a follow-up on the detail of the project. CAS #460
|
ESC08-00444
| Site Preparation | 6/2/2008 | 6/9/2008 | 6/9/2008 1:06:17 PM | A | DEFR |
|
|
Moved to a site final. CAS#460
|
ESC08-00444
| Site Final | 6/9/2008 | 6/9/2008 | 6/9/2008 1:05:36 PM | P | PASS |
|
|
Stabilized all disturbed soil with a binder with a seed mix. PASS CAS #460
|