FIR08-00699
| INSP-Sprinkler Rough-in | 6/9/2009 | 6/9/2009 | 6/11/2009 4:15:01 PM | P | PART |
|
|
Classroom wings approved for drop ceiling cover, cafeteria and gym rough-in okayed, see plans for annotations.
|
FIR08-00119
| INSP-Sprinkler Rough-in/Hydro | 6/9/2009 | 6/9/2009 | 6/11/2009 4:12:46 PM | P | PART |
|
|
Inspection for cover at the corridor grid ceiling 1st floor SE side leading to model units okayed.
|
FIR09-00272
| INSP-Final Inspection | 6/8/2009 | 6/9/2009 | 6/9/2009 3:33:30 PM | P | PART |
|
|
See plans for notes regarding one missing head at a second floor closet and one upright head to be replaced at the top of the north stairway, install for three coolers per annotations are approved.
|
FIR08-00579
| INSP-Sprinkler Rough-in/Hydro | 6/8/2009 | 6/9/2009 | 6/9/2009 3:31:14 PM | P | PART |
|
|
Field verified corrections are finished, okay to cover overhead installation.
|
FIR08-00515
| INSP-Final Inspection | 6/8/2009 | 6/9/2009 | 6/9/2009 2:04:11 PM | P | FAIL |
|
|
Operation of the smoke detector at the tool failed to initiate shunt trip power switch. Sprinkler tamper switch tested okay.
|
BLD07-02112
| FIRE-Final Inspection | 6/8/2009 | 6/9/2009 | 6/9/2009 1:04:54 PM | P | PASS |
|
|
Shell building fire life safety inspection passed, no inspection record on site for signature, additional address numbers to be posted at the east side of the structure per discussion.
|
BLD09-00228
| FIRE-Final Inspection | 6/5/2009 | 6/9/2009 | 6/9/2009 12:18:43 PM | A | CANC |
|
|
Meet in B25 review or Greg''s cube. Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
FIR09-00363
| INSP-Sprinkler Rough-in | 6/8/2009 | 6/9/2009 | 6/9/2009 12:05:09 PM | A | PART |
|
|
See approved plans for locations circled and marked with today's date okayed for sheetrock ceiling cover, noted one obstructed head by a light fixture to be relocated at the women's restroom.
|
FIR09-00176
| INSP-Conference | 6/9/2009 | 6/9/2009 | 6/9/2009 12:01:56 PM | A | DONE |
|
|
On site meeting regarding fire alarm permit work completion, site testing, plan modifications, inspection schedules, etc.
|