ESC05-01756
| Aging Inspection | 6/9/2010 | 6/9/2010 | 6/10/2010 4:23:41 PM | | DONE |
|
|
|
MEC10-01696
| Rough-in | 6/8/2010 | 6/9/2010 | 6/9/2010 4:04:07 PM | P | PASS |
|
|
tim Phone #: ###-#### ok test to hydronics and gas piping
|
MEC10-01162
| Final | 6/8/2010 | 6/9/2010 | 6/9/2010 3:33:18 PM | P | FAIL |
|
|
Please call with any questions or concerns. Key will be above front door. PLease call builder if any problems getting in. ###-#### James. Thank you...Have a wonderful day! Inspection requested from web by: Jennifer Roy Phone #: ###-#### water heater flue appears to be 3" terminating the roof. Installation instructions require 4". need 180 degree fittings on flue pipe at roof
|
MEC10-01121
| Final | 6/8/2010 | 6/9/2010 | 6/9/2010 3:16:16 PM | P | PASS |
|
|
Steve If possible please make after 1:30 Thanks Phone #: ###-####
|
MEC10-01690
| Final | 6/9/2010 | 6/9/2010 | 6/9/2010 2:33:41 PM | P | PASS |
|
|
As early as possible in the afternoon. My guys will be done around noon. Thanks, April. Inspection requested from web by: April Sims Phone #: ###-####
|
MEC10-01668
| Final | 6/9/2010 | 6/9/2010 | 6/9/2010 2:23:21 PM | P | PASS |
|
|
Phone #: ###-####
|
MEC10-01531
| Rough-in | 6/8/2010 | 6/9/2010 | 6/9/2010 1:53:59 PM | P | PASS |
|
|
Inspection requested from web by: Ariel Lindsey Phone #: ###-####
|
MEC10-01531
| DOC - Permit Finaled | 6/9/2010 | 6/9/2010 | 6/9/2010 1:53:47 PM | P | PASS |
|
|
|
MEC10-01626
| Rough-in | 6/9/2010 | 6/9/2010 | 6/9/2010 1:22:14 PM | P | PASS |
|
|
Jennifer-pressure test and rough inspection please Phone #: ###-####
|
MEC10-00156
| Pressure Test | 6/8/2010 | 6/9/2010 | 6/9/2010 10:42:42 AM | A | PASS |
|
|
The house is still under new const. so feel free to walk in. There is a key at the back door as you walk up it is to your right on some sort of shelf. Inspection requested from web by: Dustin Rich Phone #: ###-#### 25# test
|
GCM10-00098
| GCM-Final | 6/8/2010 | 6/9/2010 | 6/9/2010 10:27:00 AM | A | PASS |
|
|
Scope of Inspection: FinalContact: Brad @ ###-####
|
GCM10-00098
| GCM-Rough-in | 6/8/2010 | 6/9/2010 | 6/9/2010 10:26:09 AM | A | PASS |
|
|
Scope of Inspection: Rough-InContact: Brad @ ###-####
|
MEC10-01693
| Rough-in | 6/8/2010 | 6/9/2010 | 6/9/2010 9:25:24 AM | A | PASS |
|
|
|
MEC10-01671
| Rough-in | 6/8/2010 | 6/9/2010 | 6/8/2010 2:09:10 PM | A | CANC |
|
|
canc by contractor
|