Inspections for the day of: Thursday, June 9, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00324 Site Preparation6/3/20116/9/20116/9/2011 3:10:15 PMANR
ESC10-00472 General Inspection6/9/20116/9/20116/9/2011 3:03:00 PM PASS
ESC09-00352 Random Inspection6/9/20116/9/20116/9/2011 2:53:19 PMADONE
River levels that begun to lower. The water level within Wallings corridor have equaled oyut to the river level. Visual clarity of the water behind the rock check dam seem to be cloudy. The overcast weather conditions make it hard to justify the clarity by sight though. Will follow up if the river level drops below 4900 CFS per the USGS web site at the Glenwood monitoring station.
ESC10-00576 General Inspection6/9/20116/9/20116/9/2011 2:52:51 PM PASS
ESC11-00091 General Inspection6/9/20116/9/20116/9/2011 1:21:41 PM PASS
ESC11-00272 Site Preparation6/9/20116/9/20116/9/2011 8:18:45 AM NR
ESC11-00209 Site Preparation6/9/20116/9/20116/9/2011 8:18:35 AM NR
ESC11-00271 Site Preparation6/9/20116/9/20116/9/2011 8:18:27 AM NR