BLD14-03332
| FIRE-Final Inspection | 6/9/2015 | 6/9/2015 | 6/9/2015 3:26:39 PM | P | PASS |
|
|
Life safety pass
|
NAF15-00006
| INSP-Sprinkler Rough-in | 6/8/2015 | 6/9/2015 | 6/9/2015 11:37:02 AM | A | PART |
|
|
Ok to cover for wedge/corner common space at 1st, 2nd, 3rd flrs. Correction items: 1st flr- 1 missing sprinkler/overspaced area and 2 uninstalled corridor heads; 3rd flr- 5 uninstalled corridor heads. See notes on drawings.
Tenting of 1st floor small garage on north east end completed satisfactory.
|
BLD15-00153
| FIRE-Final Inspection | 6/5/2015 | 6/9/2015 | 6/9/2015 11:15:52 AM | A | PASS |
|
|
Life safety pass
|