BLD15-02855
| BLD-Final | 6/9/2016 | 6/9/2016 | 6/9/2016 4:47:46 PM | P | NR |
|
|
Rod// pelase call before Phone #: ###-####. Needs zoning final. Contacted Ron to let him to inform him of the required zoning final.
|
BLD16-01550
| BLD-Footing | 6/8/2016 | 6/9/2016 | 6/9/2016 2:46:35 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD16-00623
| BLD-Energy code compliance | 6/8/2016 | 6/9/2016 | 6/9/2016 1:42:33 PM | P | PASS |
|
|
Scott Phone #: ###-####
|
BLD16-00635
| BLD-Footing | 6/8/2016 | 6/9/2016 | 6/9/2016 10:58:40 AM | A | PASS |
|
|
Matt Phone #: ###-####
|
BLD16-01024
| BLD-Framing/Rough-in | 6/8/2016 | 6/9/2016 | 6/9/2016 10:11:30 AM | A | NR |
|
|
Ben Phone #: ###-####. Complete airseal pck prior to framing inspection.
|
BLD16-01947
| BLD-Final | 6/7/2016 | 6/9/2016 | 6/9/2016 9:18:11 AM | A | DONE |
|
|
Christen Phone #: ###-####
|
BLD16-01947
| DOC - Permit Finaled | 6/9/2016 | 6/9/2016 | 6/9/2016 9:18:01 AM | P | PASS |
|
|
|
BLD15-04521
| BLD-Ceiling Grid Inspection | 6/8/2016 | 6/9/2016 | 6/9/2016 8:53:52 AM | A | PART |
|
|
Ken Phone #: ###-####. Mezzanine framing. Needs to provide the additional blocking at 24 inches on center as per the approved plans and detail. ok to start sheet rocking this area. Will reinspect areas with the blocking prior to cover.
|
BLD15-04521
| BLD-Energy code compliance | 6/9/2016 | 6/9/2016 | 6/9/2016 8:49:29 AM | A | PASS |
|
|
Ken Phone #: ###-####
|