BLD20-00845
| BLD-Framing/Rough-in | 6/9/2020 | 6/9/2020 | 6/9/2020 3:30:15 PM | P | PASS |
|
|
screened // Holden Phone #: ###-####
|
BLD19-03618
| BLD-Final | 6/9/2020 | 6/9/2020 | 6/9/2020 3:28:22 PM | P | PASS |
|
|
Bruce Phone #: ###-####
|
BLD18-03143
| BLD-Wall cover | 6/8/2020 | 6/9/2020 | 6/9/2020 9:58:24 AM | A | PEND |
|
|
Elevator lobby shafts on 2 , 5 and 6 Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD20-00518
| BLD-Ceiling Grid Inspection | 6/9/2020 | 6/9/2020 | 6/9/2020 12:00:00 AM | P | CANC |
|
|
this was cancel by Zach Phone #: ###-####
|