FIR19-00911
| INSP-Sprinkler Rough-in | 6/9/2020 | 6/9/2020 | 6/9/2020 3:09:35 PM | P | PASS |
|
|
UG cover inspection passed from point of connection to the building footing/wall. Piping is ok for cover. Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
FIR19-00888
| INSP-Sprinkler Rough-in | 6/9/2020 | 6/9/2020 | 6/9/2020 2:42:36 PM | P | PASS |
|
|
The two thrust blocks have been replaced. These sections of pipe can be covered.
Bryan Collins Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-02930
| FIRE-Final Inspection | 6/8/2020 | 6/9/2020 | 6/9/2020 1:50:28 PM | A | PASS |
|
|
Life safety passed. Hardware on Mech Room door to be single action, to be verified by the building inspector.
screeend // Tom Phone #: ###-####
|
FIR20-00113
| INSP-Final Inspection | 6/8/2020 | 6/9/2020 | 6/9/2020 1:48:54 PM | A | PASS |
|
|
Permit finaled.
Buck Tom Phone #: ###-#### Inspection requested via web by Ken Webster
|
FIR18-00496
| INSP-Final Inspection | 6/5/2020 | 6/9/2020 | 6/8/2020 2:38:07 PM | P | CANC |
|
|
Inspecting Technician: Ray McQueen Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
FIR18-00931
| INSP-Final Inspection | 6/5/2020 | 6/9/2020 | 6/8/2020 2:37:25 PM | P | CANC |
|
|
Inspecting Technician: Ray McQueen Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|