PLM02-01926
| Water and/or Sewer | 6/28/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | A | PASS |
|
|
JEFF ###-####
|
PLM02-01482
| Final | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 08:24:30. Contact: ###-####. need a copy of the sewer easement 7/1/2002 2:31:45 PM
|
PLM02-01937
| Sprinkler (Final) | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01947
| Sprinkler (Final) | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | PASS |
|
|
JOSE ###-####
|
PLM02-01948
| Plumbing Rough-in | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | FAIL |
|
|
###-#### renee waste and vent test failed, test all vents thru roof. 7/1/2002 3:43:07 PM
|
PLM02-01949
| Water and/or Sewer | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | PASS |
|
|
ROB ###-####
|