BLD02-00959
| BLD-Framing/Rough-in | 6/28/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 17:31:14. Contact: ###-####.c/n for roof change (beam verification from engineer needed.) 7/1/2002 11:51:20 AM
|
BLD02-01407
| BLD-Foundation | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 06:39:39. Contact: ###-####.appears ok 1 horizontal in all walls. 7/1/2002 10:52:33 AM
|
BLD02-00703
| BLD-Final | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 07:21:19. Contact: ###-####.Post address, garage step exceeds 8 in, posted c/n on front window,called builder. 7/1/2002 12:53:02 PM
|
BLD02-00971
| BLD-Energy code compliance | 6/27/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | A | PASS |
|
|
BRIAN ###-####
|
BLD02-00685
| BLD-Framing/Rough-in | 6/27/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | A | NH |
|
|
TOM ###-####. Building is locked,left c/n stateing so. 7/1/2002 10:51:59 AM
|
MEC02-01471
| Rough-in | 6/28/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | FAIL |
|
|
###-#### call firstc/n seal return. 7/1/2002 4:47:35 PM
|
MEC02-01471
| Pressure Test | 6/28/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | FAIL |
|
|
###-#### call first
|
BLD02-01109
| BLD-Framing/Rough-in | 6/28/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | FAIL |
|
|
REX ###-####c/n posted. 7/1/2002 4:47:59 PM
|
BLD02-01118
| BLD-Framing/Rough-in | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | FAIL |
|
|
fr insp pat- ###-#### c/n posted on job card provide detail for 1 hr corridor changed from wood to steel ,also needs plm ,and ele inspections, appears fire sprinklers will be used for 1hr ceiling in basement, see notes on plans. 7/1/2002 2:24:30 PM
|
BLD01-03163
| BLD-Conference | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | NR |
|
|
check stairs,( not yet built). 7/1/2002 4:04:43 PM
|
BLD02-00706
| BLD-Final | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 08:51:05. Contact: ###-####.contractor called and canceled. Tony not in.
|
BLD02-00894
| BLD-Final | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 08:52:09. Contact: ###-####. contractor called and cancelled.
|
BLD02-01382
| BLD-Foundation | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | PART |
|
|
found- ###-####- brian 7/1/2002 2:52:27 PM, 1/2 poured, appears ok and special inspection has approved compaction report. 7/1/2002 4:37:55 PM
|
BLD02-01527
| BLD-Foundation | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | NR |
|
|
robert- ###-#### found.( must be for the walls footing allready poured. 7/1/2002 3:32:57 PM
|
BLD02-01490
| BLD-Foundation | 7/1/2002 | 7/1/2002 | 7/1/2002 12:00:00 AM | P | PASS |
|
|
re-insp- found dan- ###-####Approved plans require no re-inforcement, this has verts at 4 foot,and 3 horiz in walls. 7/1/2002 2:59:14 PM
|