MEC03-01458
| Rough-in | 6/30/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/30/2003 at 12:43:00 PM. Contact: ###-####.
|
MEC03-01458
| Pressure Test | 6/30/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/30/2003 at 12:43:35 PM. Contact: ###-####.
|
BLD02-03088
| BLD-Foundation | 6/30/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/30/2003 at 3:14:25 PM. Contact: ###-####.
wip, on walls, int. point loads, ok so far 7/1/2003 10:57:52 AM
|
BLD03-00613
| BLD-Framing/Rough-in | 6/30/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | A | PART |
|
|
ok except did not look at basement 7/1/2003 10:32:32 AM
|
BLD03-00008
| BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/1/2003 at 3:08:11 AM. Contact: ###-####.
c/n posted, also need eng. letter of ok on as built on conection of slab to wall, not per plan. 7/1/2003 3:38:35 PM
|
BLD03-00494
| BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/1/2003 at 7:22:13 AM. Contact: ###-####.
c/n posted ok to insulate 7/1/2003 11:43:41 AM
|
BLD03-00268
| BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | PART |
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
seal chases, need truss specs, etc. ,,,,ok to insulate 7/1/2003 5:38:00 PM
|
MEC03-01721
| Final | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | FAIL |
|
|
ACCESS TO HOME IS THROUGH THE ALLEY OR YOU CAN ALSO CALL CHRIS. ; Phone #: ###-#### Internet Inspection Request from: Veronica England
rouph in ,,, c/n posted 7/1/2003 4:21:35 PM
|
MEC03-01721
| Pressure Test | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | FAIL |
|
|
ACCESS TO HOME IS THROUGH THE ALLEY OR YOU CAN ALSO CALL CHRIS. ; Phone #: ###-#### Internet Inspection Request from: Veronica England
no gas line yet 7/1/2003 4:20:47 PM
|
BLD03-00196
| BLD-Final | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | DONE |
|
|
Barbara, ###-#### - let Cathy know if final
|
BLD03-01053
| BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | FAIL |
|
|
###-####
c/n posted 7/1/2003 5:39:58 PM
|
MEC03-01428
| Pressure Test | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | FAIL |
|
|
###-####
wrong size gauge? 7/1/2003 4:19:21 PM
|
BLD03-00732
| BLD-Energy code compliance | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | FAIL |
|
|
###-####
reinspection fee 44.10$ 7/1/2003 4:18:44 PM
|
MEC03-01488
| Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | PART |
|
|
###-####
need to protect gastite lines per specs 7/1/2003 3:36:13 PM
|
MEC03-01488
| Pressure Test | 7/1/2003 | 7/1/2003 | 7/1/2003 12:00:00 AM | P | PASS |
|
|
|