PLM05-02251
| Sprinkler (Final) | 7/1/2005 | 7/1/2005 | 7/1/2005 12:06:54 PM | P | PASS |
|
|
sp final ok
|
PLM05-02175
| Water and/or Sewer | 6/30/2005 | 7/1/2005 | 7/1/2005 9:44:51 AM | A | NR |
|
|
or ###-#### bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore this was a gw in the crawlspace.
|
PLM05-02251
| Sprinkler (Final) | 6/30/2005 | 7/1/2005 | 7/1/2005 8:44:50 AM | A | FAIL |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa remove connection between the two service lines, call for reinspection.
|
PLM05-02175
| Groundwork | 7/1/2005 | 7/1/2005 | 7/1/2005 12:00:00 AM | P | PASS |
|
|
or ###-#### bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore this was a gw in the crawlspace test ok
|
PLM05-02217
| Final | 6/29/2005 | 7/1/2005 | 6/30/2005 12:00:00 AM | A | CANC |
|
|
###-#### - pat Note: tub value
|