Inspections for the day of: Friday, July 1, 2005.
Number of inspections: 19
Percentage of inspections complete: 84 %
Percentage of inspections not complete: 16 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS05-00031 BLD-Conference6/28/20056/29/2005 A 
per your request Internet Inspection Request from: Letitia Mesa
BLD05-01393 BLD-Final6/30/20057/1/20057/1/2005 4:46:27 PMPPART
dustin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
temp occ ok,, need sign in braile
BLD04-02510 BLD-Final7/1/20057/1/20057/1/2005 4:20:24 PMPPASS
Scheduled by a contractor via Hello! on 7/1/2005 at 9:14:24 AM. Contact: ###-####.
c of o issued
BLD05-00608 BLD-Framing/Rough-in7/1/20057/1/20057/1/2005 3:36:57 PMPFAIL
troy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
c\n posted,, ok to insulate
BLD05-01100 BLD-Conference7/1/20057/1/20057/1/2005 2:45:47 PMPCANC
Scheduled by a contractor via Hello! on 7/1/2005 at 8:42:04 AM. Contact: ###-####.
BLD05-01067 BLD-Conference7/1/20057/1/20057/1/2005 2:28:36 PMPPART
Scheduled by a contractor via Hello! on 7/1/2005 at 9:16:43 AM.
ok for larger door instead of 2 pending historical ok,,, ftg ok
BLD05-00976 BLD-Conference6/30/20057/1/20057/1/2005 12:20:21 PMACANC
kent ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wants 425
BLD05-00904 BLD-Final6/30/20057/1/20057/1/2005 11:58:17 AMAPASS
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD04-00189 BLD-Conference6/30/20057/1/20057/1/2005 10:00:24 AMAPART
or ###-####///please call so he can meet ya there/// rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
conf. on ceiling height,, needs to be one hour,, make as high as possible,,,existing is not to code now,,,
BLD05-01326 BLD-Footing6/30/20057/1/20057/1/2005 9:34:13 AMAPART
Scheduled by a contractor via Hello! on 6/30/2005 at 4:12:40 PM. Contact: ###-####.
wip on basement ftgs
BLD05-01318 BLD-Footing6/30/20057/1/20057/1/2005 9:33:09 AMAPART
Scheduled by a contractor via Hello! on 6/30/2005 at 4:11:10 PM. Contact: ###-####.
wip basement ftgs
BLD04-01229 BLD-Final6/30/20057/1/20057/1/2005 9:11:33 AMAPASS
Scheduled by a contractor via Hello! on 6/30/2005 at 11:36:06 AM. Contact: ###-####.
BLD04-01596 BLD-Final7/1/20057/1/20057/1/2005 12:00:00 AMPCANC
marshall-- call 1st for access ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie///cancelled per Marshall with Mar Kar 7/1/05 2:33pm LEM
BLD04-01229 DOC - Permit Finaled7/1/20057/1/20057/1/2005 12:00:00 AMPPASS
BLD05-00904 DOC - Permit Finaled7/1/20057/1/20057/1/2005 12:00:00 AMPPASS
BLD05-01663 BLD-Conference7/1/20057/1/20057/1/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 6/30/2005 at 4:18:46 PM.
met w/ Keith,,, 4 plex roof is not over gravel,, its over a hot mop roof,,, Keith is putting a wider seam seal over joints and around vents, etc... looks ok,, waiting on manf. specs and installation specs
BLD04-02510 DOC - Permit Finaled7/1/20057/1/20057/1/2005 12:00:00 AMPPASS
BLD05-00055 BLD-Final7/1/20057/1/2005 P 
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-01663 BLD-Final6/30/20057/1/2005 P 
Scheduled by a contractor via Hello! on 6/30/2005 at 4:18:46 PM.