Inspections for the day of: Wednesday, July 1, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00378 Site Preparation7/1/20097/1/20097/1/2009 3:06:30 PM PASS
All dewatering is complete.
ESC07-01438 Random Inspection7/1/20097/1/20097/1/2009 2:39:40 PMPFAIL
Discussed with RP over final stabilization needing to occur soon. He said he will get back to the city soon with a plan of attack.
ESC09-00369 General Inspection7/1/20097/1/20097/1/2009 1:36:03 PMPPASS
ESC08-01043 Tracking Control7/1/20097/1/20097/1/2009 1:09:54 PMPPASS
They have deliniated the project boundry.
ESC09-00353 Site Preparation ESC7/1/20097/1/20097/1/2009 10:50:28 AM PASS
ESC09-00380 Site Preparation7/1/20097/1/20097/1/2009 9:58:46 AM FAIL
Verbal to RP:
Clean up all concrete and any other product residuals out of gutterpan and street area. Will re-inspect on 7/6/09