BLD11-01016
| FIRE-Final Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 3:29:59 PM | P | PASS |
|
|
life safety passed
|
BLD11-01089
| FIRE-Final Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 3:20:02 PM | P | FAIL |
|
|
Provide single action hardware on the restroom and breakroom doors. Replace all painted sprinkler heads as discussed and per NFPA 13 6.2.6.2. Provide for fire alarm notification in the restroom, washroom and breakroom. This work will require permit. Situation was discussed with Ben.
|
FIR11-00289
| INSP-Sprinkler Rough-in | 6/30/2011 | 7/1/2011 | 7/1/2011 3:18:08 PM | P | PART |
|
|
The first floor piping, east side of wall, piping passed rough-in inspection. Before a cover approval can be given the insulation needs to be repaired. Also three 2" 90's and an elevation change has been installed on this pipe. Provide verification with Boise City plan review to verify that the hydraulic calculations have not been adversly affected. Provide aux drain as discussed.
|
FIR11-00014
| INSP-Final Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 3:15:48 PM | P | FAIL |
|
|
The strobe in room 225 failed to function and the elevator, as per previous discussions, needs to be addressed.
|
FIR11-00159
| INSP-Sprinkler Rough-in | 6/30/2011 | 7/1/2011 | 7/1/2011 3:14:45 PM | A | PASS |
|
|
The first floor Jewelery area (6) heads and the three heads at the north side of the water curtain are ok to cover.
|
FIR10-00540
| INSP-Sprinkler Rough-in | 6/30/2011 | 7/1/2011 | 7/1/2011 3:13:39 PM | A | PASS |
|
|
See the city approved plans for the second floor areas that are ok to cover.
|
BLD10-02149
| FIRE-Final Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 2:22:48 PM | P | PASS |
|
|
life safety passed
|
FIR11-00277
| INSP-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 12:20:48 PM | A | CANC |
|
|
Shielded wire needs to be installed and the correct transformer. No inspection was performed.
|
FIR11-00274
| INSP-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 12:18:34 PM | A | CANC |
|
|
Shielded wire needs to be installed and the correct transformer. No inspection was performed.
|
FIR11-00276
| INSP-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 12:18:17 PM | A | CANC |
|
|
Shielded wire needs to be installed and the correct transformer. No inspection was performed.
|
FIR11-00275
| INSP-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 12:18:01 PM | A | CANC |
|
|
Shielded wire needs to be installed and the correct transformer. No inspection was performed.
|
FIR11-00279
| INSP-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 12:17:13 PM | A | CANC |
|
|
Shielded wire needs to be installed and the correct transformer. No inspection was performed.
|
FIR11-00278
| INSP-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 12:16:56 PM | A | CANC |
|
|
Shielded wire needs to be installed and the correct transformer. No inspection was performed.
|
BLD10-00620
| FIRE-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 12:15:43 PM | A | PASS |
|
|
Life safety passed. Tony to verify signage and repaired emergency light.
|
BLD11-01009
| FIRE-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 12:14:36 PM | A | PASS |
|
|
life safety passed
|
BLD11-00300
| FIRE-Final Inspection | 6/30/2011 | 7/1/2011 | 7/1/2011 7:32:19 AM | A | PASS |
|
|
Life safety passed
|