FIR13-00011
| INSP-Conference | 7/1/2013 | 7/1/2013 | 7/1/2013 5:42:39 PM | P | DONE |
|
|
Regarding upright coverage at the mechanical penthouse.
|
BLD12-03139
| FIRE-Sprinkler Rough-in | 7/1/2013 | 7/1/2013 | 7/1/2013 5:41:27 PM | P | PART |
|
|
Okay to cover the remainder of grid ceiling areas at the remodel.
|
FIR13-00121
| INSP-Final Inspection | 7/1/2013 | 7/1/2013 | 7/1/2013 5:39:23 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR13-00264
| INSP-Supply line flush | 7/1/2013 | 7/1/2013 | 7/1/2013 3:10:38 PM | P | PASS |
|
|
UG fire supply line flush completed satisfactory.
|
BLD13-00790
| FIRE-Conference | 6/28/2013 | 7/1/2013 | 7/1/2013 1:13:50 PM | A | DONE |
|
|
On site conference with contractor regarding project related FIR trade work, project schedule, fire life safety conditions, plan review, etc.
|
BLD13-01669
| FIRE-Final Inspection | 6/28/2013 | 7/1/2013 | 7/1/2013 11:26:27 AM | A | PASS |
|
|
Fire life safety inspection passed.
|