Inspections for the day of: Wednesday, July 1, 2015.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00109 Aging Inspection7/1/20157/1/20157/2/2015 1:00:11 PM CANC
ESC14-00588 General Inspection6/30/20157/1/20157/1/2015 3:56:43 PMAPASS
No activity at site. No fugitive dust and no dewatering occuring. Will check back....no corrections or issues at this time.

ESC14-00868 General Inspection7/1/20157/1/20157/1/2015 3:10:43 PM PEND
Need to remove section of silt fence between Warm Springs Road and Walling Creek across from Starview.
ESC15-00094 Random Inspection7/1/20157/1/20157/1/2015 2:52:38 PMPPASS
No significant trackout at upper and lower entrances to new subdivision phase. Some dust due to unloading but not crossing property lines at time of inspection and no neighbor complaints received.

Will continue to monitor. No corrections issued at this time. Central Paving crews are onsite.
ESC14-01044 General Inspection7/1/20157/1/20157/1/2015 2:33:28 PM PASS
WIP. Back hillside has been left preserved. No erosion issues. Draco culdesac is free of sediment. No spills observed. Approved.
ESC14-00299 General Inspection7/1/20157/1/20157/1/2015 2:11:22 PM PASS
Gutter and street are clean in front of house. DI protected. Retaining wall at bottom of project has curb that ccontains al sediment. No corrections needed.
ESC14-01173 General Inspection7/1/20157/1/20157/1/2015 1:57:47 PM PASS
No remaining excavation or loose dirt on site. Project area within vegetated and walled backyard. No futher ESC inspections necessary. Permit closed.
ESC14-01173 DOC - Permit Finaled7/1/20157/1/20157/1/2015 1:56:46 PMPPASS
ESC15-00005 General Inspection7/1/20157/1/20157/1/2015 1:47:24 PM PASS
ESC14-01200 General Inspection7/1/20157/1/20157/1/2015 12:13:20 PM PASS
Norco warehouse expansion in progress. No sediment leaving the gated area of costruction/disturbance. No trackout or discharges observed. Approved.
ESC15-00756 Site Preparation7/1/20157/1/20157/1/2015 11:51:09 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00714 Site Preparation7/1/20157/1/20157/1/2015 11:50:51 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00683 Site Preparation7/1/20157/1/20157/1/2015 11:49:24 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00684 Site Preparation7/1/20157/1/20157/1/2015 11:49:08 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00682 Site Preparation7/1/20157/1/20157/1/2015 11:48:48 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00679 Site Preparation7/1/20157/1/20157/1/2015 11:48:31 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00666 Site Preparation7/1/20157/1/20157/1/2015 11:48:15 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00665 Site Preparation7/1/20157/1/20157/1/2015 11:44:38 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00672 Site Preparation7/1/20157/1/20157/1/2015 11:44:16 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00752 Site Preparation7/1/20157/1/20157/1/2015 11:43:28 AMPPASS
New Hayden Homes SFH in new phase of Sunnyridge.

11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
ESC15-00724 Site Preparation6/30/20157/1/20157/1/2015 11:28:10 AMAPASS
Adam Phone #: ###-####

Permit posted. Sunnyridge BMPs installed. Approved for excavation.
ESC14-01030 General Inspection7/1/20157/1/20157/1/2015 11:13:35 AM PASS
Warehouse structure is complete. Site improvements, parking lot, and landscaping are now occuring. No trackout or discharges offsite. No fugitive dust observed. Approved.
ESC15-00266 BMP Violation6/30/20157/1/20157/1/2015 11:02:21 AMAFAIL
Housekeeping and trash clean up are needed ASAP

Uncontained trash and debris throughout site.

Correction request phoned in to RP/GC Gary

1. Collect all building and worker related trash around site include windblown litter.
2. Sweep up dust (dirt, wallboard, sawdust) and dispose properly
3. Have all trash containers emptied/serviced
ESC15-00039 Site Final7/1/20157/1/20157/1/2015 10:39:38 AMPPASS
Mattress Firm sign is complete. Silt fence BMP removed around site perimter. ESC permit conditions met.
ESC13-00592 Site Final7/1/20157/1/20157/1/2015 10:38:19 AMPPASS
Silt fence has now been removed and site is adequately stable. ESC permit conditions satisfied.
ESC14-01098 Aging Inspection7/1/20157/1/20157/1/2015 9:58:41 AM PASS
WIP on interior. Need to conduct clean up of adjacent lot before ESC final. No discharges, spills, or loose dirt leaving site. Trash contained. Project near completion.