ESC15-00109
| Aging Inspection | 7/1/2015 | 7/1/2015 | 7/2/2015 1:00:11 PM | | CANC |
|
|
|
ESC14-00588
| General Inspection | 6/30/2015 | 7/1/2015 | 7/1/2015 3:56:43 PM | A | PASS |
|
|
No activity at site. No fugitive dust and no dewatering occuring. Will check back....no corrections or issues at this time.
|
ESC14-00868
| General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 3:10:43 PM | | PEND |
|
|
Need to remove section of silt fence between Warm Springs Road and Walling Creek across from Starview.
|
ESC15-00094
| Random Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 2:52:38 PM | P | PASS |
|
|
No significant trackout at upper and lower entrances to new subdivision phase. Some dust due to unloading but not crossing property lines at time of inspection and no neighbor complaints received.
Will continue to monitor. No corrections issued at this time. Central Paving crews are onsite.
|
ESC14-01044
| General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 2:33:28 PM | | PASS |
|
|
WIP. Back hillside has been left preserved. No erosion issues. Draco culdesac is free of sediment. No spills observed. Approved.
|
ESC14-00299
| General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 2:11:22 PM | | PASS |
|
|
Gutter and street are clean in front of house. DI protected. Retaining wall at bottom of project has curb that ccontains al sediment. No corrections needed.
|
ESC14-01173
| General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 1:57:47 PM | | PASS |
|
|
No remaining excavation or loose dirt on site. Project area within vegetated and walled backyard. No futher ESC inspections necessary. Permit closed.
|
ESC14-01173
| DOC - Permit Finaled | 7/1/2015 | 7/1/2015 | 7/1/2015 1:56:46 PM | P | PASS |
|
|
|
ESC15-00005
| General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 1:47:24 PM | | PASS |
|
|
|
ESC14-01200
| General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 12:13:20 PM | | PASS |
|
|
Norco warehouse expansion in progress. No sediment leaving the gated area of costruction/disturbance. No trackout or discharges observed. Approved.
|
ESC15-00756
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:51:09 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00714
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:50:51 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00683
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:49:24 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00684
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:49:08 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00682
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:48:48 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00679
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:48:31 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00666
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:48:15 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00665
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:44:38 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00672
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:44:16 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00752
| Site Preparation | 7/1/2015 | 7/1/2015 | 7/1/2015 11:43:28 AM | P | PASS |
|
|
New Hayden Homes SFH in new phase of Sunnyridge.
11 new HH projects with open permits. New lined concrete washout to be installed next week to the southwest of the pool house on Bear Ridge. All contractors can use per Morgan, HH project manager.
|
ESC15-00724
| Site Preparation | 6/30/2015 | 7/1/2015 | 7/1/2015 11:28:10 AM | A | PASS |
|
|
Adam Phone #: ###-####
Permit posted. Sunnyridge BMPs installed. Approved for excavation.
|
ESC14-01030
| General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 11:13:35 AM | | PASS |
|
|
Warehouse structure is complete. Site improvements, parking lot, and landscaping are now occuring. No trackout or discharges offsite. No fugitive dust observed. Approved.
|
ESC15-00266
| BMP Violation | 6/30/2015 | 7/1/2015 | 7/1/2015 11:02:21 AM | A | FAIL |
|
|
Housekeeping and trash clean up are needed ASAP
Uncontained trash and debris throughout site.
Correction request phoned in to RP/GC Gary
1. Collect all building and worker related trash around site include windblown litter. 2. Sweep up dust (dirt, wallboard, sawdust) and dispose properly 3. Have all trash containers emptied/serviced
|
ESC15-00039
| Site Final | 7/1/2015 | 7/1/2015 | 7/1/2015 10:39:38 AM | P | PASS |
|
|
Mattress Firm sign is complete. Silt fence BMP removed around site perimter. ESC permit conditions met.
|
ESC13-00592
| Site Final | 7/1/2015 | 7/1/2015 | 7/1/2015 10:38:19 AM | P | PASS |
|
|
Silt fence has now been removed and site is adequately stable. ESC permit conditions satisfied.
|
ESC14-01098
| Aging Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 9:58:41 AM | | PASS |
|
|
WIP on interior. Need to conduct clean up of adjacent lot before ESC final. No discharges, spills, or loose dirt leaving site. Trash contained. Project near completion.
|