BLD19-03042
| BLD-Footing | 6/30/2020 | 7/1/2020 | 7/1/2020 4:19:12 PM | A | PEND |
|
|
bob Phone #: ###-####. Engineer to sign off on epoxy, no special inspection. Aslo need RFI for column pad footings and aditional letter from engineer waiving special inspection on concrete.
|
BLD20-01600
| BLD-Final | 6/30/2020 | 7/1/2020 | 7/1/2020 3:48:57 PM | P | DONE |
|
|
Onsite contact: Mierins ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD20-01600
| DOC - Permit Finaled | 7/1/2020 | 7/1/2020 | 7/1/2020 3:48:42 PM | P | PASS |
|
|
|
BLD20-00768
| BLD-Energy code compliance | 7/1/2020 | 7/1/2020 | 7/1/2020 3:25:34 PM | P | PASS |
|
|
Brian *screened* Phone #: ###-####
|
BLD20-00768
| BLD-Framing/Rough-in | 7/1/2020 | 7/1/2020 | 7/1/2020 3:25:23 PM | P | CANC |
|
|
Brian *screened* Phone #: ###-####
|
BLD20-01389
| BLD-Final | 7/1/2020 | 7/1/2020 | 7/1/2020 3:10:55 PM | P | PASS |
|
|
Screened // Mike Phone #: ###-####
|
BLD20-01389
| DOC - Permit Finaled | 7/1/2020 | 7/1/2020 | 7/1/2020 3:10:43 PM | P | PASS |
|
|
|
BLD20-00033
| BLD-Framing/Rough-in | 7/1/2020 | 7/1/2020 | 7/1/2020 2:29:24 PM | P | PASS |
|
|
Tim *screened* Phone #: ###-####. Interior steel stud framed walls.
|
BLD20-01588
| BLD-Final | 6/30/2020 | 7/1/2020 | 7/1/2020 1:49:36 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Raistrick. ok for perm occ.
|
BLD18-02618
| BLD-Framing/Rough-in | 7/1/2020 | 7/1/2020 | 7/1/2020 1:33:49 PM | P | NH |
|
|
Denise *screened* Phone #: ###-####. No one home, no access. Will need to reschedule.
|
BLD20-01255
| BLD-Framing/Rough-in | 7/1/2020 | 7/1/2020 | 7/1/2020 11:44:25 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Allen Jones. Bracr bottom chord above filler on A02 trusses. Install 4x8 header over doorway to front bedroom. Ok to insulate. C/N posted.
|
BLD20-01620
| BLD-Wall Bracing | 7/1/2020 | 7/1/2020 | 7/1/2020 11:27:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Allen Jones
|
BLD20-01272
| BLD-Wall Bracing | 7/1/2020 | 7/1/2020 | 7/1/2020 11:04:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Allen Jones
|
BLD20-02215
| BLD-Conference | 7/1/2020 | 7/1/2020 | 7/1/2020 10:38:03 AM | A | DONE |
|
|
have a 3 layer roof need written conformation 3 layer roof must be striped to deck so asphalt shingles can be nailed to solid deck per code R905.2.1 and code R908.3.1.1 Phone #: ###-#### Inspection requested via web by Scott Tennant. On site to issue a correction notice notice. Per IRC sec. 908.3.1.1 item #3, roof recover is not allowed where the existing roof has two or more applications of any type of roof covering. Also noted roofers were removing all exisitng roof coverings down to shating while on site.
|
BLD18-01027
| BLD-Framing/Rough-in | 6/24/2020 | 7/1/2020 | 7/1/2020 10:15:16 AM | A | CANC |
|
|
|
BLD20-01599
| BLD-Framing/Rough-in | 6/30/2020 | 7/1/2020 | 7/1/2020 9:18:31 AM | A | PASS |
|
|
Jay Walters is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting. All modules placed per plan. All clearnces maintained. As per letter from structural engineer, no work need to reinforce existing roof.
|
BLD20-00209
| BLD-Foundation | 6/30/2020 | 7/1/2020 | 7/1/2020 9:00:41 AM | A | CANC |
|
|
Would like to place 2 columns next to existing building at 10:30 am. Phone #: ###-#### Inspection requested via web by John Saucerman. concrete pilasters against existing columns.
|
BLD20-00295
| BLD-Wall Bracing | 6/30/2020 | 7/1/2020 | 7/1/2020 8:34:34 AM | A | PASS |
|
|
Could not answer questions......shear // rod Phone #: ###-####. Interior shear wall ok.
|