Inspections for the day of: Monday, July 10, 2000.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-01991 Final7/7/20007/10/20007/10/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/07/2000 at 12:12:08. Contact: ###-####. connect s&w , then call for a final 7/10/00 10:02:12 AM
PLM00-02375 Water and/or Sewer7/7/20007/10/20007/10/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/07/2000 at 13:07:36. Contact: ###-####. incomplete 7/10/00 10:06:30 AM
PLM00-02231 Plumbing Rough-in7/7/20007/10/20007/10/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/07/2000 at 14:40:35. Contact: ###-####.done friday 7/10/00 8:09:39 AM
PLM00-02352 Other7/10/20007/10/20007/10/2000 12:00:00 AMAPART
Added by Inspector: 330 On 7/10/00 well disconnect well disconnected service ran not tied in in crawlspace 7/10/00 10:57:26 AM
PLM00-02133 Water and/or Sewer7/10/20007/10/20007/10/2000 12:00:00 AMAPART
Added by Inspector: 330 On 7/10/00 water services to portables from tie in to 40' from buildings
PLM00-00618 Final7/10/20007/10/20007/10/2000 12:00:00 AMAFAIL
Added by Inspector: 330 On 7/10/00 4833 dorman install hose reels, airgap on t&p drain, airgap fitting on dishwasher drain, test premis protection, complete installation of containment tank on the south side of the building. 7/10/00 9:33:49 AM
PLM00-02374 Water and/or Sewer7/10/20007/10/20007/10/2000 12:00:00 AMPPASS
Scheduled by Inspector: 330 On 7/10/00 1200 melrose 2869244 7/10/00 10:08:55 AM
PLM00-02133 Water and/or Sewer7/10/20007/10/20007/10/2000 12:00:00 AMPPART
Scheduled by Inspector: 330 On 7/10/00 part water temp to trailors sw of n2 plant 7/11/00 8:01:42 AM
PLM00-01672 Groundwork7/10/20007/10/20007/10/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/10/2000 at 08:54:13. Contact: ###-####.
PLM99-03905 Final7/10/20007/10/20007/10/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/10/2000 at 09:48:54. Contact: ###-####. set last fixture, lav 7/11/00 8:02:45 AM
PLM99-03795 Final7/10/20007/10/20007/10/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/10/2000 at 09:49:57. Contact: ###-####.
PLM00-02352 Water and/or Sewer7/10/20007/10/20007/10/2000 12:00:00 AMPPART
waterline only reinspection ken ###-#### service piping and disconnect only not tied in under house 7/10/00 1:57:31 PM
PLM00-02406 Plumbing Rough-in7/10/20007/10/20007/10/2000 12:00:00 AMPPASS
###-####- rob r/i
PLM00-01680 Final7/10/20007/10/20007/10/2000 12:00:00 AMPPASS
rob-- ###-#### -fn
PLM00-02375 Water and/or Sewer7/10/20007/10/20007/10/2000 12:00:00 AMPPART
Scheduled by Inspector: 330 On 7/10/00 1204 melrose 2869244 7/10/00 10:09:05 AM