BLD00-02233
| BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 7/10/2001 7:51:37 AM w/ bldr(St. Lukes) re verbal c/n
|
BLD01-01726
| BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 7/10/2001 9:25:50 AM w/ bldr re c/n...recall insp
|
BLD01-01720
| BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 7/10/2001 9:38:24 AM w/ bldr re c/n...recall shear insp
|
BLD00-02062
| BLD-Concrete | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
masonary grouting ###-####; columns at south 7/10/2001 5:29:34 PM
|
BLD01-00531
| BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 7/10/2001 3:56:59 PM w/Mike Phillips, need 3hr door at elevator ( or equal as approved) as noted during inspection; shafts to be req'd per plan check interpretation of 710 & 711.3 ubc 7/10/2001 4:04:05 PM
|
BLD01-000-1
| BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 7/10/2001 3:58:58 PM w/ Mike Phillips; elev shaft opening req's actual door as noted at inspection...not just Dover elevator door (w/o rating)
|
BLD01-01806
| BLD-Footing | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 7/10/2001 4:12:18 PM gar ftg
|
BLD01-00000
| BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 7/10/2001 5:30:44 PM w/ Mike re elev. shaft at s-3 parking...need rated door
|
BLD01-00822
| BLD-Framing/Rough-in | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 08:14:35. Contact: ###-####. partitions ok 7/10/2001 4:05:42 PM
|
BLD01-01720
| BLD-Framing/Rough-in | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
SHEAR WALL ANTHONY ###-####; ok to side, chk int. pahd 5 or equal at frame 7/10/2001 10:48:33 AM
|
BLD01-00890
| BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 12:16:09. Contact: ###-####....walls/storefront soffit ok pend elec; need 2 copies resub for store room changes for file. 7/10/2001 5:28:53 PM
|
BLD01-01426
| BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
above ceiling and grid insp ###-####...grid & firestops ok 7/10/2001 3:42:03 PM
|
BLD01-01757
| BLD-Foundation | 7/9/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PASS |
|
|
###-#### ftg& walls, bar ok, hd's ok 7/10/2001 12:16:40 PM
|