BLD01-00620
| BLD-Aging Inspection | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | | PART |
|
|
wip. 7/17/2001 11:40:22 AM
|
BLD01-00630
| BLD-Aging Inspection | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | | PART |
|
|
wip. 7/17/2001 11:40:30 AM
|
BLD01-00588
| BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 14:21:27. Contact: ###-####.c/n posted. 7/10/2001 11:58:18 AM
|
BLD01-00061
| BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | A | PART |
|
|
###-####. need to have plans on site for a frame insp left note on ok to side sticker. 7/10/2001 10:45:10 AM
|
BLD00-02817
| BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 17:04:50. Contact: ###-####.ok to sheetrock. 7/10/2001 4:37:27 PM
|
BLD01-01032
| BLD-Footing | 7/9/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | FAIL |
|
|
ft insp robert- ###-#### c/n posted for electrical conduit in footing. 7/10/2001 4:37:10 PM
|
BLD01-01343
| BLD-Framing/Rough-in | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 08:17:23. Contact: ###-####. need elect,plumbing approvred,ok to rock 1 side, recall when ready. No c/n talked with JC. 7/10/2001 1:58:05 PM
|
BLD01-01159
| BLD-Framing/Rough-in | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | FAIL |
|
|
###-####. need approved plans. 7/10/2001 1:19:30 PM
|
BLD01-00729
| BLD-Foundation | 7/10/2001 | 7/10/2001 | 7/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 10:38:48. Contact: .ok pending s-i report. 7/10/2001 4:36:46 PM
|