MEC02-01865
| Pressure Test | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | A | FAIL |
|
|
jan ###-#### /30 psi gage max preasure failled 7/10/2002 2:01:34 PM
|
MEC02-01833
| Final | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | A | PASS |
|
|
THOMAS ###-####
|
BLD02-00054
| BLD-Final | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | A | NR |
|
|
###-####
|
BLD02-00800
| BLD-Final | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | A | PASS |
|
|
final ok 7/10/2002 9:01:37 AM
|
BLD99-02811
| BLD-Conference | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | A | PASS |
|
|
ele and driveway complet. 7/11/2002 8:32:32 AM
|
BLD01-00954
| BLD-Framing/Rough-in | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | A | FAIL |
|
|
bruce ###-#### fr missing fire stopping at drops. 7/10/2002 1:46:42 PM
|
BLD01-00398
| BLD-Wall cover | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD01-01809
| BLD-Wall cover | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | P | CANC |
|
|
|
BLD02-01455
| BLD-Footing | 7/10/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | P | PART |
|
|
DANE ###-#### wip set backs per plan. 7/10/2002 2:26:19 PM
|
BLD02-01457
| BLD-Footing | 7/10/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | P | PART |
|
|
DANE ###-#### wip set backs per plan 7/10/2002 2:26:04 PM
|
MEC02-01784
| Rough-in | 7/10/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 08:52:07. Contact: ###-####.
|