FIR02-00123
| INSP-Supply line flush | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 12:11:38. Contact: ###-####.
|
BLD01-02848
| FIRE-Conference | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 13:06:40. Contact: ###-####. met with GC about getting leter in for temporary occupancy to Dave Miller 7/10/2002 11:00:04 AM
|
BLD01-00234
| FIRE-Conference | 7/10/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | P | PART |
|
|
wendel ###-#### told wendelll to get the occ cards turned in to Cathy 7/10/2002 2:41:21 PM
|
FIR02-00028
| INSP-Final Inspection | 7/10/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | P | PASS |
|
|
TERRY ###-####
|
FIR02-00063
| INSP-Final Inspection | 7/9/2002 | 7/10/2002 | 7/10/2002 12:00:00 AM | P | FAIL |
|
|
brian- ###-#### combustibles around perimeter; entry vestibules on west side need sprinkler coverage; 7/11/2002 10:28:42 AM
|