Inspections for the day of: Wednesday, July 10, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02017 BLD-Final7/9/20027/10/20027/10/2002 12:00:00 AMANR
###-#### still needs elec final 7/10/2002 10:44:41 AM
BLD02-00155 BLD-Footing7/9/20027/10/20027/10/2002 12:00:00 AMANR
late am ###-####
MEC02-01869 Pressure Test7/9/20027/10/20027/10/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/09/2002 at 15:06:56. Contact: ###-####.
BLD02-00832 BLD-Final7/9/20027/10/20027/10/2002 12:00:00 AMAPASS
###-####. 7/9/2002 6:14:35 PM
BLD01-00875 BLD-Framing/Rough-in7/8/20027/10/20027/10/2002 12:00:00 AMACANC
roger- -###-#### fr
BLD02-00554 BLD-Foundation7/9/20027/10/20027/10/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 07/09/2002 at 08:12:51. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/10/2002 at 07:15:02.
BLD02-00757 BLD-Framing/Rough-in7/9/20027/10/20027/10/2002 12:00:00 AMAPART
JACK ###-#### CELING GRID pods ok crew can start dropping in pannels but need to leave out areas so elec and mec can inspect 7/10/2002 10:03:27 AM
BLD02-01597 BLD-Framing/Rough-in7/9/20027/10/20027/10/2002 12:00:00 AMPCANC
###-#### charity rebar
BLD02-00554 BLD-Foundation7/10/20027/10/20027/10/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/10/2002 at 07:16:06. Contact: ###-####.rebar in forms about 80% complete 7/10/2002 2:52:04 PM
BLD02-00558 BLD-Footing7/10/20027/10/20027/10/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/10/2002 at 07:17:02. Contact: ###-####. set backs ok forms at about 75 % no rebar installed 7/10/2002 2:53:03 PM
BLD02-01267 BLD-Final7/10/20027/10/20027/10/2002 12:00:00 AMPPASS
###-#### bryan
BLD01-02764 BLD-Final7/10/20027/10/20027/10/2002 12:00:00 AMPPASS
###-####c.c # 164 90 issued 7/10/2002 1:47:07 PM
BLD02-00155 BLD-Footing7/10/20027/10/20027/10/2002 12:00:00 AMPPART
mti on site this project is being covered by spec inspection nent over project with in spector 7/10/2002 2:51:26 PM
BLD02-01597 BLD-Concrete7/10/20027/10/20027/10/2002 12:00:00 AMPPASS