Inspections for the day of: Thursday, July 10, 2003.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00660 BLD-Framing/Rough-in7/9/20037/10/20037/10/2003 12:00:00 AMANR
###-####- CHARLOTTE Reviewed procedures with owner--i.e--need all required trades prior to framing. Owner will get trade items completed and inspection prior to framing. No inspection performed. 7/10/2003 9:37:01 AM
BLD03-01460 BLD-Foundation7/9/20037/10/20037/10/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 7/9/2003 at 11:46:19 AM. Contact: ###-####. wip 7/10/2003 10:08:57 AM
BLD03-01460 BLD-Footing7/9/20037/10/20037/10/2003 12:00:00 AMADONE
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Already done--appears ok, setbacks fine. 7/10/2003 10:09:20 AM
BLD03-01400 BLD-Footing7/9/20037/10/20037/10/2003 12:00:00 AMADONE
Scheduled by a contractor via Hello! on 7/9/2003 at 12:20:31 PM. Contact: ###-####.
BLD03-01401 BLD-Foundation7/9/20037/10/20037/10/2003 12:00:00 AMADONE
Scheduled by a contractor via Hello! on 7/9/2003 at 12:22:50 PM. Contact: ###-####.
MEC03-01743 Rough-in7/9/20037/10/20037/10/2003 12:00:00 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Veronica England C/N insulation shield required in attic. 7/10/2003 10:18:30 AM
MEC03-01743 Pressure Test7/9/20037/10/20037/10/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Veronica England
BLD03-01400 BLD-Foundation7/9/20037/10/20037/10/2003 12:00:00 AMADONE
shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD03-01390 BLD-Footing7/9/20037/10/20037/10/2003 12:00:00 AMAPART
shawn late morning please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip 7/10/2003 10:30:04 AM
MEC03-00662 Final7/9/20037/10/20037/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/9/2003 at 2:23:52 PM. Contact: ###-####.
BLD03-01037 BLD-Framing/Rough-in7/9/20037/10/20037/10/2003 12:00:00 AMAFAIL
justin shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore No approved plans on site-no inspection performed. 7/10/2003 9:06:51 AM
BLD03-01427 BLD-Framing/Rough-in7/10/20037/10/20037/10/2003 12:00:00 AMPPART
###-#### justin Interior walls ok to cover, need additional wall brace on north side of interior (2) offices, (verify at final), set of 3 storage racks in warehouse need engineering, can verify loading, signage, bracing at final, contractor to secure fire/life safety prior to final. 7/10/2003 1:59:55 PM
MEC03-01781 Rough-in7/10/20037/10/20037/10/2003 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Lena Sloan
MEC03-01485 Rough-in7/10/20037/10/20037/10/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 7/10/2003 at 9:42:39 AM. Contact: ###-####.
MEC03-01808 Final7/10/20037/10/20037/10/2003 12:00:00 AMPPASS
###-#### SHARON
MEC03-01350 Final7/10/20037/10/20037/10/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 7/10/2003 at 9:55:50 AM. Contact: ###-####.
MEC03-01405 Final7/10/20037/10/20037/10/2003 12:00:00 AMPPASS
please call half hour prior thomas; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC03-01810 Pressure Test7/10/20037/10/20037/10/2003 12:00:00 AMPDONE
###-#### tml Intermountain gas witness tested gas line. 7/10/2003 3:52:36 PM
MEC03-01810 Final7/10/20037/10/20037/10/2003 12:00:00 AMPPASS