ELE04-00301
| ELE-Aging Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 4:30:42 PM | | NR |
|
|
checked with contr, should be getting closer for final
|
ELE06-00703
| Final | 7/10/2006 | 7/10/2006 | 7/10/2006 4:29:04 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/10/2006 at 10:07:00 AM. Contact: ###-####. corr made, ok to final
|
ELE06-02528
| Final | 7/10/2006 | 7/10/2006 | 7/10/2006 3:36:08 PM | P | PASS |
|
|
chuck - #53; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to final
|
ELE05-00855
| ELE-Aging Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 2:28:56 PM | | DONE |
|
|
suc
|
ELE06-00319
| Electrical Rough-In | 7/10/2006 | 7/10/2006 | 7/10/2006 2:27:56 PM | P | PART |
|
|
JENNIE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover out side perimeter walls only around office areas
|
ELE06-02155
| Rough-In Permanent Service | 7/7/2006 | 7/10/2006 | 7/10/2006 1:07:15 PM | P | PART |
|
|
underground for service to pool area thyere will be a service change done permit has been changed thanks joe; Phone #: ###-#### Internet Inspection Request from: joe wheeler called contr to ensure 18" depth where mud sluffed in. ok to cover u/g from service area to pool area only
|
ELE06-02501
| Rough-In Permanent Service | 7/6/2006 | 7/10/2006 | 7/10/2006 11:05:51 AM | A | NR |
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called left message, too many things not ready,garage not done,front lite boxes,lv in line voltage raceways, 1 1/4" holes and cable, nm stapled on edges, subpanel cable not strapped, wrong clamp for same, bath fixtures missing, stair fixt missing, tub not ready, too many nm cables under staples, said to call when ready
|
ELE06-00703
| Final | 7/7/2006 | 7/10/2006 | 7/10/2006 10:07:10 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/7/2006 at 5:39:58 PM. Contact: ###-####. told elect, left corr notice, 210.52(D) recpt shall be within 3' 0f basin in mbr, 422.16(B)(2) disposal cord shall not be over 36", 406.4(D) recpt faceplate shall be flush or project from recpt face, 408.4 panelboard schedule shall be complete and accurate
|
ELE06-01369
| Final | 7/7/2006 | 7/10/2006 | 7/10/2006 9:53:56 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: William Zerfas called left message left corr notice, nec 210.8(A)(6) kitchen recpts shall be gfci protected, BCC microwave recpt shall be completed
|
ELE06-01627
| Permanent Service | 7/7/2006 | 7/10/2006 | 7/10/2006 9:35:50 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton p/s u/g n ok
|
ELE06-02496
| Rough-In Permanent Service | 7/10/2006 | 7/10/2006 | 7/10/2006 9:19:54 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 7/10/2006 at 5:33:07 AM. Contact: ###-####. p/s u/g n ok, called on ri, nec 300.4(D) nm cable shall be 1 1/4" from edge of framing member,314.20 boxes shall be flush in walls of combustible material, 210.52(A) shall add recpt to 2' wall by hall to bedrooms, BCC all make-up shall be done
|
ELE06-02247
| Final | 7/7/2006 | 7/10/2006 | 7/10/2006 8:46:43 AM | A | NH |
|
|
final on 1 room addition, back door will be open okay to go in, house is vacant. any questions call Tate @ ###-#### Internet Inspection Request from: Andy Rose 2nd time no acess,called ,fee due
|
ELE06-02497
| Rough-In Permanent Service | 7/10/2006 | 7/10/2006 | 7/10/2006 8:41:50 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/10/2006 at 5:35:30 AM. Contact: ###-####. ric ok, p/s u/g n ok
|
ELE06-02160
| Electrical Rough-In | 7/10/2006 | 7/10/2006 | 7/10/2006 8:09:37 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/10/2006 at 6:00:06 AM. Contact: ###-####. called, left message, BCC equipotential plane shall be on blocks ready to pour
|