FIR05-00033
| INSP-Final Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 4:15:55 PM | P | PART |
|
|
C/N items from the previous inspection have been verified for completion, tested main FACP batteries, AC loss, phone lines, smoke above panel, need to provide locks at breakers, tested tamper switches, flow switches, addresses at flows do not match map or actual location. SD, manual pulls and notification to be tested at next inspection request. Duct detector testing is complete.
|
FIR06-00426
| INSP-Final Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 4:12:11 PM | P | PART |
|
|
Fire alarm work for this tenant passed inspection, final pending alarm upgrade permit final in process for the remainder of the existing building.
|
FIR05-00713
| INSP-Final Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 2:38:11 PM | P | PART |
|
|
Items on previous correction notice have been addressed, need to attatch unistrut hangers to structure with an approved method above two rooms at the west side, heads at west room are overspaced off one wall, verify heads in the skylights are the proper temp. rating, wall at the storage room east side will require sheetrock to maintain proper separation between upright heads.
|
FIR06-00140
| INSP-Final Inspection | 7/7/2006 | 7/10/2006 | 7/10/2006 12:38:08 PM | A | PASS |
|
|
Fire sprinkler passed final inspection.
|
FIR06-00101
| INSP-Sprinkler Rough-in | 7/7/2006 | 7/10/2006 | 7/10/2006 12:27:07 PM | A | NR |
|
|
Per contractor the inspection request was intended for Tues. 7/11, no approved plans on site for review, to be rescheduled.
|