MEC05-04051
| MEC-Aging Inspection | 7/10/2006 | 7/10/2006 | 7/12/2006 1:53:04 PM | | PASS |
|
|
wip
|
MEC06-00427
| MEC-Aging Inspection | 7/10/2006 | 7/10/2006 | 7/12/2006 1:51:12 PM | | PASS |
|
|
called g/c..wip
|
MEC06-02212
| Rough-in | 7/10/2006 | 7/10/2006 | 7/11/2006 10:49:56 AM | P | PASS |
|
|
Internet Inspection Request from: Shelley Baisch
|
MEC06-02248
| Rough-in | 7/10/2006 | 7/10/2006 | 7/10/2006 4:40:47 PM | P | PART |
|
|
Internet Inspection Request from: Shelley Baisch..I CALLED THE HEATING CONT AND THEY WILL BE READY WED PM..SO I RESCHEDULED THIS FOR YOU..THANKS DIXIE
|
MEC06-02045
| Pressure Test | 7/10/2006 | 7/10/2006 | 7/10/2006 4:26:03 PM | P | PASS |
|
|
ROB; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
MEC06-02045
| Rough-in | 7/10/2006 | 7/10/2006 | 7/10/2006 4:24:18 PM | P | PASS |
|
|
ROB; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
MEC06-02200
| Rough-in | 7/7/2006 | 7/10/2006 | 7/10/2006 3:18:13 PM | A | NR |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..i had an inspector meeting today..called mike to reschedule for tues am at 9:00..thanks
|
MEC06-02240
| Pressure Test | 7/10/2006 | 7/10/2006 | 7/10/2006 2:53:38 PM | P | PASS |
|
|
###-#### steve
|
MEC06-02245
| Final | 7/8/2006 | 7/10/2006 | 7/10/2006 2:44:16 PM | A | FAIL |
|
|
PAT PAGER #99763; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister...i paged pat at 8:11am and he hasn't called me back..dixie
|
MEC06-02162
| Final | 7/7/2006 | 7/10/2006 | 7/10/2006 2:42:48 PM | A | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS..oops..need comb air, insulate pvc flue in crawl with 1 1/2" armaflex by final..thanks
|
MEC06-02162
| Rough-in | 7/10/2006 | 7/10/2006 | 7/10/2006 2:41:31 PM | A | PASS |
|
|
r/i and 20lb test to bbq ok
|
MEC06-00874
| Final | 7/7/2006 | 7/10/2006 | 7/10/2006 1:02:24 PM | A | PASS |
|
|
Please contact job foreman, Matt Hines - ###-####. Internet Inspection Request from: RaChelle Meister
|
MEC06-02093
| Rough-in | 7/7/2006 | 7/10/2006 | 7/10/2006 11:40:03 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 7/7/2006 at 6:23:30 PM. Contact: ###-####...ok to partial cover..talked with tony and contractor and he will recall when correct duct is installed..grovers sold him the metal accordian flex duct
|
MEC06-02240
| Pressure Test | 7/7/2006 | 7/10/2006 | 7/10/2006 9:45:44 AM | A | NR |
|
|
Please call Steve with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel...i rescheduled this for pm...meeting this am
|