BLD05-00790
| FIRE-Final Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 4:30:05 PM | A | CANC |
|
|
Wrong inspector for inspection
|
FIR05-00800
| INSP-Final Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 4:28:14 PM | P | PART |
|
|
The second floor portion of the fire alarm system is passed. Still need to test the connection between the new NAC and the main FACP.
|
FIR06-00246
| INSP-Alarm Testing | 7/10/2006 | 7/10/2006 | 7/10/2006 4:26:20 PM | P | FAIL |
|
|
No test performed due to ehen the manual pull station in the basement was pulled not a/v's went off. The pull station that was tested did not corrispond with the assigned address on the plans. Also the a/v in the kitchen needs to be relocated as discussed due to blockage by duct work. All other a/v's appear to be located correctly. No other testing was done.
|
FIR05-00588
| INSP-Final Inspection | 7/7/2006 | 7/10/2006 | 7/10/2006 4:18:49 PM | A | FAIL |
|
|
Provide map at the facp, fix the pone line one and phone line two reporting, outside alarm bell can not be silenced by the facp and provide atleast 8.3 ah battery for the facp.
|
BLD05-02073
| FIRE-Final Inspection | 7/7/2006 | 7/10/2006 | 7/10/2006 12:57:37 PM | A | PART |
|
|
The second floor only is ok to occupy.
|