Inspections for the day of: Monday, July 10, 2006.
Number of inspections: 55
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-01764 Tracking Control7/10/20067/10/20067/10/2006 3:11:07 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01985 Tracking Control7/10/20067/10/20067/10/2006 3:10:27 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01812 Tracking Control7/10/20067/10/20067/10/2006 3:09:49 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC06-00318 Tracking Control7/10/20067/10/20067/10/2006 3:07:59 PMPCANC
ESC05-01028 Complaint Inspection7/10/20067/10/20067/10/2006 3:07:52 PMPCANC
ESC05-01974 Tracking Control7/10/20067/10/20067/10/2006 3:05:49 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01975 Tracking Control7/10/20067/10/20067/10/2006 3:04:44 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01393 Tracking Control7/10/20067/10/20067/10/2006 3:04:23 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01978 Tracking Control7/10/20067/10/20067/10/2006 3:02:42 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01987 Tracking Control7/10/20067/10/20067/10/2006 3:02:28 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01392 Tracking Control7/10/20067/10/20067/10/2006 3:01:58 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01986 Tracking Control7/10/20067/10/20067/10/2006 3:01:46 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01982 Tracking Control7/10/20067/10/20067/10/2006 3:01:15 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01282 Tracking Control7/10/20067/10/20067/10/2006 3:00:43 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01813 Tracking Control7/10/20067/10/20067/10/2006 2:59:30 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC05-01983 Tracking Control7/10/20067/10/20067/10/2006 2:58:37 PMPPART
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
ESC06-00297 Tracking Control7/5/20067/10/20067/10/2006 2:38:59 PMACANC
ESC06-00593 Tracking Control7/5/20067/10/20067/10/2006 2:38:33 PMACANC
ESC06-00109 Tracking Control7/5/20067/10/20067/10/2006 2:38:19 PMACANC
ESC05-01412 Site Final7/10/20067/10/20067/10/2006 2:03:16 PMPPASS
Final stabilization has been completed.
ESC05-00846 Site Final7/10/20067/10/20067/10/2006 2:03:03 PMPPASS
Final stabilization has been completed.
ESC05-00769 Site Final7/10/20067/10/20067/10/2006 2:02:48 PMPPASS
Final stabilization has been completed.
ESC05-01214 Site Final7/10/20067/10/20067/10/2006 2:02:35 PMPPASS
Final stabilization has been completed.
ESC05-01361 Site Final7/10/20067/10/20067/10/2006 2:02:17 PMPPASS
Final stabilization has been completed.
ESC05-01360 Site Final7/10/20067/10/20067/10/2006 2:01:54 PMPPASS
Final stabilization has been completed.
ESC05-01215 Site Final7/10/20067/10/20067/10/2006 2:01:27 PMPPASS
Final stabilization has been completed.
ESC06-00090 Tracking Control7/5/20067/10/20067/10/2006 1:57:11 PMAPASS
Final stabilization has been completed.
ESC05-01384 Site Final7/10/20067/10/20067/10/2006 1:57:03 PMPPASS
Final stabilization has been completed.
ESC05-01216 Site Final7/10/20067/10/20067/10/2006 1:56:50 PMPPASS
Final stabilization has been completed.
ESC05-01656 Site Final7/10/20067/10/20067/10/2006 1:56:38 PMPPASS
Final stabilization has been completed.
ESC05-01211 Site Final7/10/20067/10/20067/10/2006 1:56:26 PMPPASS
Final stabilization has been completed.
ESC05-01121 Site Final7/10/20067/10/20067/10/2006 1:46:18 PMPPASS
Final stabilization has been completed.
ESC05-01595 Tracking Control7/10/20067/10/20067/10/2006 1:43:58 PMPPASS
Site looks good.
ESC05-01595 Complaint Inspection7/10/20067/10/20067/10/2006 1:43:29 PMPCANC
ESC06-00145 Tracking Control7/10/20067/10/20067/10/2006 1:42:33 PMPPASS
Site looks good.
ESC05-01594 Tracking Control7/10/20067/10/20067/10/2006 1:42:17 PMPPASS
Site looks good.
ESC05-01815 Tracking Control7/10/20067/10/20067/10/2006 1:41:14 PMPPASS
Site looks okay.
ESC05-01119 Site Final7/10/20067/10/20067/10/2006 1:40:11 PMPPASS
Final stablization has been completed.
ESC05-00928 Site Final7/10/20067/10/20067/10/2006 1:39:52 PMPPASS
Final stabilization has been completed.
ESC06-00633 Complaint Inspection7/10/20067/10/20067/10/2006 1:35:06 PMPPART
Contacted RP about putting a trash container on site.
ESC06-00587 Complaint Inspection7/10/20067/10/20067/10/2006 1:32:21 PMPFAIL
Responded to citizen complaint regarding trash on site. Verbal c/n given to RP for trash maintenance needed on site and ESC sign needs to be reposted.
ESC06-00598 Complaint Inspection7/10/20067/10/20067/10/2006 1:32:10 PMPFAIL
Responded to citizen complaint regarding trash on site. Verbal c/n given to RP for trash maintenance needed on site and ESC sign needs to be reposted.
ESC06-00598 Complaint Inspection7/10/20067/10/20067/10/2006 1:20:34 PMPCANC
ESC06-00587 Complaint Inspection7/10/20067/10/20067/10/2006 1:20:25 PMPCANC
ESC05-00934 Site Final7/10/20067/10/20067/10/2006 1:14:17 PMPPASS
Final stabilization has been completed.
ESC05-00918 Site Final7/10/20067/10/20067/10/2006 1:14:07 PMPPASS
Final stabilization has been completed.
ESC05-00767 Site Final7/10/20067/10/20067/10/2006 1:13:55 PMPPASS
Final stabilization has been completed.
ESC06-00785 Site Final7/10/20067/10/20067/10/2006 1:11:29 PMPPASS
ESC06-00785 Site Final7/10/20067/10/20067/10/2006 1:11:21 PMPPASS
ESC05-00708 Site Final7/10/20067/10/20067/10/2006 1:11:11 PMPPASS
ESC05-00535 Site Final7/10/20067/10/20067/10/2006 1:11:01 PMPPASS
Final stabilization has been completed.
ESC05-00715 Site Final7/10/20067/10/20067/10/2006 1:09:54 PMPPASS
Final stabilization has been completed.
ESC05-00711 Site Final7/10/20067/10/20067/10/2006 1:09:42 PMPPASS
Final stabilization has been completed.
ESC05-00957 Site Final7/10/20067/10/20067/10/2006 1:09:28 PMPPASS
Final stabilization has been completed.
ESC06-01078 Conference7/7/20067/10/20067/10/2006 11:26:43 AMAPASS
Met with RP, developer, and owner to walk site and discuss bmp installation and dewatering issues during construction phase. Informed owner of responsibilities and permit requirements. Will inspect again once construction is underway.