Inspections for the day of: Tuesday, July 10, 2007.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-00343 FIRE-Final Inspection7/10/20077/10/20077/11/2007 12:20:26 PMAFAIL
Missing one exit sign at the north side stairway door.
BLD07-00343 FIRE-Alarm Testing7/10/20077/10/20077/11/2007 12:19:23 PMAPART
Alarm testing completed.
FIR07-00481 INSP-Sprinkler Rough-in7/9/20077/10/20077/10/2007 3:56:17 PMPPART
OH rough-in inspection completed okay, good for cover at the basement level only, the first floor has two locations where tenting is not adequate.
FIR07-00448 INSP-Supply line flush7/9/20077/10/20077/10/2007 3:27:32 PMPPART
UG fire supply line flush completed satisfactory, hydrostatic test not ready due to pressure loss at the guage.
FIR07-00208 INSP-Final Inspection7/9/20077/10/20077/10/2007 2:30:02 PMAFAIL
Per fire code review notes items 2 and 5, need record of inspection and testing completed prior to final, supervisory signals shall be self restoring, missing lock at the FACP breaker, provide means to test phase reversal at the pump.
FIR07-00234 INSP-Sprinkler Rough-in/Hydro7/9/20077/10/20077/10/2007 1:33:24 PMAFAIL
Per requirements of IFC 2003 903.3.1.2.1 sprinkler protection shall be provided for exterior balconies and ground floor patios of dwelling units protected by a 13R system. The overhead hydrostatic testing for building 2 completed satisfactory.
BLD07-00824 FIRE-Final Inspection7/9/20077/10/20077/10/2007 11:40:38 AMANR
Need the project related fire sprinkler permit finaled, also missing doors, ceilling tile, etc., project is not ready for life safety final at this time.
FIR07-00313 INSP-Final Inspection7/10/20077/10/20077/10/2007 11:38:18 AMAPASS
c/n items are finished, fire alarm passed final inspection, permit finaled.
FIR07-00453 INSP-Final Inspection7/9/20077/10/20077/10/2007 11:36:55 AMAPASS
Corrections verified for completion, fire sprinkler permit finaled.