Inspections for the day of: Thursday, July 10, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM08-01621 Plumbing Rough-in7/9/20087/10/20087/10/2008 4:34:09 PMPPASS
please call Brian with questions at ###-####. thanks! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne
PLM08-01537 Water Heater Final7/9/20087/10/20087/10/2008 3:12:48 PMPPASS
Contact is Stuart @ ###-####. Job#21956 Phone #: ###-#### Internet Inspection Request from: SUE OGLESBY
PLM08-00054 Final7/10/20087/10/20087/10/2008 3:00:52 PMPPART
Last 3 units ready for inspection. Call Johny with any questions ###-####.
Thank you. Phone #: ###-#### Internet Inspection Request from: Jennifer Alcala made walk through of last three unit ok
PLM08-01463 Water and/or Sewer7/10/20087/10/20087/10/2008 2:39:08 PMPPART
Sewer only inspection Phone #: ###-#### Internet Inspection Request from: Holly Cormell sewer stub in to building only test ok
PLM08-01192 Plumbing Rough-in7/10/20087/10/20087/10/2008 2:15:13 PMPFAIL
Tom Phone #: ###-#### need to provide shutoff valves for each dwelling unit as per upc 605.3 need to repipe each unit for softner rough-in,s need to up date permit on fixture count talked to plumber on site will recall when ready
PLM08-01641 Water and/or Sewer7/9/20087/10/20087/10/2008 1:06:52 PMACANC
Phone #: ###-#### Internet Inspection Request from: raul castanon
PLM08-00759 Final7/9/20087/10/20087/10/2008 11:00:57 AMAFAIL
key in lockbox on gas meter. lock box code is 0633 Phone #: ###-#### Internet Inspection Request from: Penny Smith need to have P V B for sprinkler tested and certified upc 604.11.2 no pex tubing shall be installed with in the first 18 inches to a water heater need to repipe T&P drain in a approved method
PLM06-01181 Final7/9/20087/10/20087/10/2008 10:12:40 AMANR
Rick Phone #: ###-#### not ready
PLM08-01608 Sprinkler (Final)7/9/20087/10/20087/10/2008 9:28:10 AMAPASS
Leta Phone #: ###-####
PLM08-01629 Water and/or Sewer7/9/20087/10/20087/10/2008 9:18:03 AMAPART
Phone #: ###-#### Internet Inspection Request from: Dave Wood sewer line down stream of building clean out test ok need to change building cleanout and piping in to building to sch. 40 pvc building like materal contractor to recall when ready
PLM08-00342 PLM-Aging Inspection7/10/20087/10/20087/10/2008 8:35:03 AM PASS
PLM08-00016 PLM-Aging Inspection7/10/20087/10/20087/10/2008 8:34:24 AM PASS
PLM08-01628 Water and/or Sewer7/9/20087/10/20087/10/2008 8:28:46 AMACANC
Bob Phone #: ###-####