BLD06-02303
| BLD-Concrete | 7/9/2008 | 7/10/2008 | 7/14/2008 7:07:13 AM | A | PART |
|
|
Brad Phone #: ###-####
|
BLD08-01425
| BLD-Footing | 7/9/2008 | 7/10/2008 | 7/10/2008 4:14:45 PM | P | NR |
|
|
Dan Phone #: ###-#### needs terrys recodes ok
|
BLD08-01159
| BLD-Framing/Rough-in | 7/10/2008 | 7/10/2008 | 7/10/2008 3:40:00 PM | P | PASS |
|
|
Matt Phone #: ###-#### ok to cover
|
BLD07-02123
| BLD-Framing/Rough-in | 7/10/2008 | 7/10/2008 | 7/10/2008 3:34:02 PM | P | PART |
|
|
Ben Phone #: ###-#### ok to insulate still need to see truss engineering strape overcut and under lapped splices in top plates finish rocking 2hr wall and fire cualk pins and flase around fire dampers
|
BLD06-01081
| BLD-Final | 7/9/2008 | 7/10/2008 | 7/10/2008 3:30:56 PM | A | PART |
|
|
Call Barb mike will call in for finals
|
BLD08-00956
| BLD-Framing/Rough-in | 7/9/2008 | 7/10/2008 | 7/10/2008 3:30:10 PM | P | PART |
|
|
Rob Phone #: ###-#### see marked up areas on plans looked at framing and floor to wall straping on second fl and replacement of sheet rock lid in basement hallway all ok to cover
|
BLD05-01094
| BLD-Final | 7/9/2008 | 7/10/2008 | 7/10/2008 12:03:27 PM | A | PART |
|
|
Call Barb
|
BLD07-00813
| BLD-Final | 7/9/2008 | 7/10/2008 | 7/10/2008 12:02:50 PM | A | FAIL |
|
|
Daryl Phone #: ###-#### needs a 45 min door on soiled room
|
BLD08-00659
| BLD-Final | 7/9/2008 | 7/10/2008 | 7/10/2008 12:00:21 PM | A | PART |
|
|
Rick Phone #: ###-#### ok for temp needs to change door on upper level
|
BLD08-01192
| BLD-Framing/Rough-in | 7/9/2008 | 7/10/2008 | 7/10/2008 9:57:32 AM | A | NR |
|
|
john Phone #: ###-#### needs other trades to do rough ins first
|