Inspections for the day of: Thursday, July 10, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02303 BLD-Concrete7/9/20087/10/20087/14/2008 7:07:13 AMAPART
Brad Phone #: ###-####
BLD08-01425 BLD-Footing7/9/20087/10/20087/10/2008 4:14:45 PMPNR
Dan Phone #: ###-#### needs terrys recodes ok
BLD08-01159 BLD-Framing/Rough-in7/10/20087/10/20087/10/2008 3:40:00 PMPPASS
Matt Phone #: ###-#### ok to cover
BLD07-02123 BLD-Framing/Rough-in7/10/20087/10/20087/10/2008 3:34:02 PMPPART
Ben Phone #: ###-#### ok to insulate still need to see truss engineering strape overcut and under lapped splices in top plates finish rocking 2hr wall and fire cualk pins and flase around fire dampers
BLD06-01081 BLD-Final7/9/20087/10/20087/10/2008 3:30:56 PMAPART
Call Barb mike will call in for finals
BLD08-00956 BLD-Framing/Rough-in7/9/20087/10/20087/10/2008 3:30:10 PMPPART
Rob Phone #: ###-#### see marked up areas on plans looked at framing and floor to wall straping on second fl and replacement of sheet rock lid in basement hallway all ok to cover
BLD05-01094 BLD-Final7/9/20087/10/20087/10/2008 12:03:27 PMAPART
Call Barb
BLD07-00813 BLD-Final7/9/20087/10/20087/10/2008 12:02:50 PMAFAIL
Daryl Phone #: ###-#### needs a 45 min door on soiled room
BLD08-00659 BLD-Final7/9/20087/10/20087/10/2008 12:00:21 PMAPART
Rick Phone #: ###-#### ok for temp needs to change door on upper level
BLD08-01192 BLD-Framing/Rough-in7/9/20087/10/20087/10/2008 9:57:32 AMANR
john Phone #: ###-#### needs other trades to do rough ins first