Inspections for the day of: Thursday, July 10, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01394 FIRE-Final Inspection7/10/20087/10/20087/10/2008 3:59:37 PMPPASS
fire life safety passed
FIR07-00606 INSP-Sprinkler Rough-in/Hydro7/10/20087/10/20087/10/2008 3:47:12 PMPPART
See the city approved resubmittals for the areas that are ok to cover. They include the cafeteria and the corridor to the immediate north. The surrounding hallways did not have the earthquaking installed on the 2 1/2" mains.
FIR08-00459 INSP-Final Inspection7/10/20087/10/20087/10/2008 11:55:00 AMPPASS
permit finaled
FIR08-00458 INSP-Final Inspection7/10/20087/10/20087/10/2008 11:54:41 AMPPASS
Permit finaled
BLD07-01418 FIRE-Final Inspection7/10/20087/10/20087/10/2008 11:10:45 AMPPASS
fire life safety passed.
FIR07-00902 INSP-Conference7/10/20087/10/20087/10/2008 11:10:00 AMPDONE
The conference was for the curved clouds in the first floor corridor. It appears that the way dave wants to install the sprinkler heads is acceptable and that floor coverage is being met.
FIR08-00411 INSP-Sprinkler Rough-in/Hydro7/8/20087/10/20087/10/2008 11:08:40 AMAPASS
The sprinkler piping rough-in passed. Will need a follow-up inspection for the tenting and insulation. The riser has not been built yet.
FIR08-00457 INSP-Final Inspection7/10/20087/10/20087/10/2008 10:14:20 AMPPASS
Permit finaled
BLD08-01272 FIRE-Final Inspection7/9/20087/10/20087/10/2008 9:44:45 AMAPASS
fire life safety passed