ESC06-00074
| Aging Inspection | 7/10/2008 | 7/10/2008 | 7/11/2008 9:27:46 AM | | DEFR |
|
|
Moved to a site final. CAS
|
ESC07-01478
| BMP Violation | 7/10/2008 | 7/10/2008 | 7/10/2008 4:32:02 PM | P | FAIL |
|
|
Notice of Correction. Spoke with the RP, over the pertaining issues. 1. Install all bmp's per erosion control plan and additional along the front of lot. 2. Put up the ESC sign with the proper info. 3. Clean up all sediment and rock chip pile off of the right away. Will re-inspect on 7/14/08 CAS 460
|
ESC06-00086
| Aging Inspection | 7/10/2008 | 7/10/2008 | 7/10/2008 3:48:18 PM | | DEFR |
|
|
Moved to a site final. CAS
|
ESC06-00086
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 3:48:11 PM | P | PASS |
|
|
All work is complete. Project area is stabilized. CAS
|
ESC07-00924
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 3:32:08 PM | P | PASS |
|
|
All work has been completed.Site is stabilized. CAS 460
|
ESC08-00443
| General Inspection | 7/10/2008 | 7/10/2008 | 7/10/2008 2:10:07 PM | P | FAIL |
|
|
Spoke with RP over installing a proper construction entrance. Clean up debris surrounding the D.I.'s on the project area. Figure out a way to surpress the dust on site. Will re-inspect on 07/15/08 CAS 460
|
ESC06-00083
| Aging Inspection | 7/10/2008 | 7/10/2008 | 7/10/2008 1:56:29 PM | | DEFR |
|
|
Moved to a site final. CAS
|
ESC06-00083
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 1:56:23 PM | P | PASS |
|
|
All work has been completed. CAS
|
ESC06-00082
| Aging Inspection | 7/10/2008 | 7/10/2008 | 7/10/2008 1:55:46 PM | | DEFR |
|
|
Moved to a site final. CAS
|
ESC06-00082
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 1:55:41 PM | P | PASS |
|
|
All work has been completed. CAS 460
|
ESC07-01278
| General Inspection | 7/10/2008 | 7/10/2008 | 7/10/2008 11:42:56 AM | A | FAIL |
|
|
Need to clean up the entrance off of Victory and the old entrance into the parking lot. Told RP and the contractor to have it done by today. Will re-inspect on 7/11/08 CAS
|
ESC05-00045
| Site Preparation | 7/10/2008 | 7/10/2008 | 7/10/2008 9:54:31 AM | P | PASS |
|
|
Site looks good. No tracking off of project area. CAS
|
ESC07-00288
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 9:35:30 AM | A | PASS |
|
|
All final landscaping is completed. All work is completed. CAS 460
|
ESC07-00289
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 9:35:09 AM | A | PASS |
|
|
All final landscaping is completed. All work is completed. CAS 460
|
ESC07-00291
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 9:34:39 AM | A | PASS |
|
|
All final landscaping is completed. All work is completed. CAS 460
|
ESC07-00294
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 9:34:18 AM | A | PASS |
|
|
All final landscaping is completed. All work is completed. CAS 460
|
ESC07-00295
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 9:33:54 AM | A | PASS |
|
|
All final landscaping is completed. All work is completed. CAS 460
|
ESC07-00295
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 9:33:32 AM | A | PASS |
|
|
All final landscaping is completed. All work is completed. CAS 460
|
ESC07-00296
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 9:33:05 AM | A | PASS |
|
|
All final landscaping is completed. All work is completed. CAS 460
|
ESC07-00305
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 9:32:43 AM | P | PASS |
|
|
All final landscaping is completed. All work is completed. CAS 460
|
ESC08-00019
| Random Inspection | 7/10/2008 | 7/10/2008 | 7/10/2008 8:51:57 AM | P | PART |
|
|
Trash debris that needs to be cleaned up around the lot. CAS 460
|
ESC08-00116
| Site Preparation | 7/10/2008 | 7/10/2008 | 7/10/2008 8:48:09 AM | A | PASS |
|
|
Site looks good. Sign posted at front of lot. CAS 460
|
ESC08-00115
| Site Preparation | 7/10/2008 | 7/10/2008 | 7/10/2008 8:47:02 AM | P | PASS |
|
|
Site looks good. No issues present Sign posted at front of lot. CAS 460
|
ESC06-00006
| Site Final | 7/10/2008 | 7/10/2008 | 7/10/2008 8:38:18 AM | P | PASS |
|
|
All landscaping is complete. No disturbed soil. Work is completed. CAS
|