Inspections for the day of: Thursday, July 10, 2008.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00074 Aging Inspection7/10/20087/10/20087/11/2008 9:27:46 AM DEFR
Moved to a site final.
CAS
ESC07-01478 BMP Violation7/10/20087/10/20087/10/2008 4:32:02 PMPFAIL
Notice of Correction.
Spoke with the RP, over the pertaining issues.
1. Install all bmp's per erosion control plan and additional along the front of lot.
2. Put up the ESC sign with the proper info.
3. Clean up all sediment and rock chip pile off of the right away.
Will re-inspect on 7/14/08
CAS
460
ESC06-00086 Aging Inspection7/10/20087/10/20087/10/2008 3:48:18 PM DEFR
Moved to a site final.
CAS
ESC06-00086 Site Final7/10/20087/10/20087/10/2008 3:48:11 PMPPASS
All work is complete. Project area is stabilized.
CAS
ESC07-00924 Site Final7/10/20087/10/20087/10/2008 3:32:08 PMPPASS
All work has been completed.Site is stabilized.
CAS
460
ESC08-00443 General Inspection7/10/20087/10/20087/10/2008 2:10:07 PMPFAIL
Spoke with RP over installing a proper construction entrance.
Clean up debris surrounding the D.I.'s on the project area.
Figure out a way to surpress the dust on site. Will re-inspect on 07/15/08
CAS
460
ESC06-00083 Aging Inspection7/10/20087/10/20087/10/2008 1:56:29 PM DEFR
Moved to a site final.
CAS
ESC06-00083 Site Final7/10/20087/10/20087/10/2008 1:56:23 PMPPASS
All work has been completed.
CAS
ESC06-00082 Aging Inspection7/10/20087/10/20087/10/2008 1:55:46 PM DEFR
Moved to a site final.
CAS
ESC06-00082 Site Final7/10/20087/10/20087/10/2008 1:55:41 PMPPASS
All work has been completed.
CAS
460
ESC07-01278 General Inspection7/10/20087/10/20087/10/2008 11:42:56 AMAFAIL
Need to clean up the entrance off of Victory and the old entrance into the parking lot. Told RP and the contractor to have it done by today. Will re-inspect on 7/11/08
CAS
ESC05-00045 Site Preparation7/10/20087/10/20087/10/2008 9:54:31 AMPPASS
Site looks good. No tracking off of project area.
CAS
ESC07-00288 Site Final7/10/20087/10/20087/10/2008 9:35:30 AMAPASS
All final landscaping is completed. All work is completed.
CAS
460
ESC07-00289 Site Final7/10/20087/10/20087/10/2008 9:35:09 AMAPASS
All final landscaping is completed. All work is completed.
CAS
460
ESC07-00291 Site Final7/10/20087/10/20087/10/2008 9:34:39 AMAPASS
All final landscaping is completed. All work is completed.
CAS
460
ESC07-00294 Site Final7/10/20087/10/20087/10/2008 9:34:18 AMAPASS
All final landscaping is completed. All work is completed.
CAS
460
ESC07-00295 Site Final7/10/20087/10/20087/10/2008 9:33:54 AMAPASS
All final landscaping is completed. All work is completed.
CAS
460
ESC07-00295 Site Final7/10/20087/10/20087/10/2008 9:33:32 AMAPASS
All final landscaping is completed. All work is completed.
CAS
460
ESC07-00296 Site Final7/10/20087/10/20087/10/2008 9:33:05 AMAPASS
All final landscaping is completed. All work is completed.
CAS
460
ESC07-00305 Site Final7/10/20087/10/20087/10/2008 9:32:43 AMPPASS
All final landscaping is completed. All work is completed.
CAS
460
ESC08-00019 Random Inspection7/10/20087/10/20087/10/2008 8:51:57 AMPPART
Trash debris that needs to be cleaned up around the lot.
CAS
460
ESC08-00116 Site Preparation7/10/20087/10/20087/10/2008 8:48:09 AMAPASS
Site looks good. Sign posted at front of lot.
CAS
460
ESC08-00115 Site Preparation7/10/20087/10/20087/10/2008 8:47:02 AMPPASS
Site looks good. No issues present Sign posted at front of lot.
CAS
460
ESC06-00006 Site Final7/10/20087/10/20087/10/2008 8:38:18 AMPPASS
All landscaping is complete. No disturbed soil. Work is completed.
CAS