FIR12-00274
| INSP-Sprinkler Rough-in | 7/10/2012 | 7/10/2012 | 7/10/2012 3:51:02 PM | P | PASS |
|
|
Sprinkler piping can be covered.
|
BLD11-02834
| FIRE-Conference | 7/10/2012 | 7/10/2012 | 7/10/2012 3:35:24 PM | P | DONE |
|
|
Life safety will be ok to final when the project related fire alarm permit is finaled.
|
FIR12-00245
| INSP-Final Inspection | 7/10/2012 | 7/10/2012 | 7/10/2012 3:28:58 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00201
| INSP-Final Inspection | 7/10/2012 | 7/10/2012 | 7/10/2012 3:28:40 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00293
| INSP-Final Inspection | 7/9/2012 | 7/10/2012 | 7/10/2012 3:25:42 PM | A | FAIL |
|
|
To final this permit the inoperative hvac unit needs to be repaired and all four of the hvac units needs to shutdown immediately upon detection of smoke. They currently shut down after several minutes. As-builts are needed showing the changes.
|
FIR11-00435
| INSP-Final Inspection | 7/10/2012 | 7/10/2012 | 7/10/2012 3:23:41 PM | A | FAIL |
|
|
Horns did not sync though it is better with the new changes. Horns shall sync per NFPA 72, 18.4.2.5 and per the Boise City Fire Dept.
|
FIR12-00270
| INSP-Final Inspection | 7/10/2012 | 7/10/2012 | 7/10/2012 3:21:40 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00274
| INSP-Conference | 7/9/2012 | 7/10/2012 | 7/10/2012 9:57:18 AM | A | DONE |
|
|
Sprinkler piping is ok to cover.
|
BLD12-01735
| FIRE-Final Inspection | 7/9/2012 | 7/10/2012 | 7/10/2012 9:56:21 AM | A | FAIL |
|
|
Resubmit plans showing the actual floor layout (mezzanines), resubmit plans and information on the paint room and plating room that shows compliance with IFC chapter 15, provide single action hardware at the exit doors other than the main exit. This includes removing the dead bolts. Remove material/products obstructing doors.
|
BLD12-00524
| FIRE-Sprinkler Rough-in | 7/10/2012 | 7/10/2012 | 7/10/2012 8:38:01 AM | A | PASS |
|
|
Insulation has been repaired. Sprinkler piping is ok to cover.
|