Inspections for the day of: Tuesday, July 10, 2012.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00198 General Inspection7/10/20127/10/20127/11/2012 9:26:44 AM PASS
ESC12-00077 General Inspection7/10/20127/10/20127/11/2012 9:00:13 AM PASS
ESC11-00517 Conference7/10/20127/10/20127/11/2012 12:00:00 AMA 
Discussed with ESI over their notice of voilation they receivefrom EPA. We discussed over the 6 items of violation. I explained to them to quickly correct and respond back to EPA. Making sue that the response back to EPA shows all of the required supporting changes to the violation they received.
ESC12-00124 General Inspection7/10/20127/10/20127/10/2012 1:57:59 PM PASS
ESC12-00298 General Inspection7/10/20127/10/20127/10/2012 1:48:50 PM PART
ESC12-00281 BMP Violation7/10/20127/10/20127/10/2012 1:46:53 PMAFAIL
Correction Notice:
Clean up all sediment and debris off of the hard surfaces. Provides a contauinment for the mortar mixer also clean up all mortar overflow residual surrounding the mortar mixer. Failure to comply with the notice, wil result in further enforcement can occur but not limited to a Stop Work Order may be issued. Will re-inspect on 7/12/2012 AM.
ESC11-00675 Aging Inspection7/10/20127/10/20127/10/2012 11:46:06 AM DONE
Permit Finaled.
ESC11-00675 DOC - Permit Finaled7/10/20127/10/20127/10/2012 11:45:50 AMPPASS
ESC11-00719 Aging Inspection7/10/20127/10/20127/10/2012 11:28:09 AM DONE
Permit finaled.
ESC11-00719 DOC - Permit Finaled7/10/20127/10/20127/10/2012 11:27:55 AMPPASS
ESC12-00403 General Inspection7/10/20127/10/20127/10/2012 11:27:33 AM PASS
ESC11-00900 General Inspection7/10/20127/10/20127/10/2012 9:04:21 AM PASS
ESC12-00067 Tracking Control7/6/20127/10/20127/10/2012 8:47:17 AMAPART
One of the two accesses are stabilized. The other one has compacted pit run. Have told the RP, "if tracking starts to occur out of the access with compacted pit run he will have to stabilize it."
ESC12-00154 General Inspection7/10/20127/10/20127/10/2012 8:12:46 AM FAIL
Verbal to RP and project super;
Clean up all hard surfaces of all sediment and debris. Replace the rock bags along the gutter pan of the ones that are broken apart. Provide storm drain inlet protection on all 4 of the storm drains at the entrance and exit of the school. Will follow up on 7/11/2012 PM.