ELE11-01094
| Electrical Rough-In | 7/10/2013 | 7/10/2013 | 7/10/2013 3:55:54 PM | P | PASS |
|
|
rough-in ok cover kitchen,dinning area,family room
|
ELE13-01739
| Rough-In Permanent Service | 7/10/2013 | 7/10/2013 | 7/10/2013 2:37:44 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov rough-in p/s u/g n ok
|
ELE13-01185
| Final | 7/10/2013 | 7/10/2013 | 7/10/2013 2:36:33 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov final ok
|
ELE10-01718
| ELE-Aging Inspection | 7/10/2013 | 7/10/2013 | 7/10/2013 2:12:40 PM | | DONE |
|
|
Doc exspired
|
ELE10-01718
| DOC - Permit Expired | 7/10/2013 | 7/10/2013 | 7/10/2013 2:11:58 PM | P | DONE |
|
|
No contact with electrical contractor, job complete, inspection with homeower. final ok
|
ELE11-01326
| DOC - Permit Expired | 7/10/2013 | 7/10/2013 | 7/10/2013 1:59:19 PM | P | DONE |
|
|
No contact, job complete. inspection checks out ok
|
ELE13-00498
| Electrical Rough-In | 7/9/2013 | 7/10/2013 | 7/10/2013 1:07:27 PM | P | PASS |
|
|
Contact: Andy Eckhart. Can we get that inspection after 2:00 please. for ceilings in break 584, conf 581, conf 582, hall 585, G.O. Support 575, EMS work area 574 and R.D. 573. Phone #: ###-#### >> Inspection requested via web by Deb Gooden rough-in ok cover ceiling grid per list
|
ELE13-01658
| Electrical Rough-In | 7/10/2013 | 7/10/2013 | 7/10/2013 12:42:06 PM | P | PASS |
|
|
brandon Phone #: ###-#### rough-in ok cover walls classroom B
|
ELE13-01752
| Permanent Service | 7/9/2013 | 7/10/2013 | 7/10/2013 12:13:46 PM | P | PASS |
|
|
Installed new mast on service, any questions please call Clint @ ###-#### Phone #: ###-#### >> Inspection requested via web by Andy Rose p/s o/h rec ok
|
ELE13-01749
| Final | 7/9/2013 | 7/10/2013 | 7/10/2013 10:38:23 AM | A | FAIL |
|
|
Need ok for idaho power to restore power.lock box code is 2180. Phone #: ###-#### >> Inspection requested via web by Randy Fletcher Meter requires identification,address. NEC 250.56 Permanent service requires two ground rods unless 25 ohms of resistance to ground. Verify water pipe grounding and bonding jumper at water heater. Provide panel directory for final inspection
|
ELE13-01787
| Final | 7/9/2013 | 7/10/2013 | 7/10/2013 10:00:11 AM | A | PASS |
|
|
Removed existing surface mounted fixtures, installed 12 new grid fixtures. Site will be open at 9:30 AM. Secretary will be there to let you in, fixtures are located in back area. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson final ok
|
ELE12-00179
| ELE-Request for Extension | 7/9/2013 | 7/10/2013 | 7/10/2013 9:46:02 AM | A | DONE |
|
|
Brandi Phone #: ###-#### extension ok
|
ELE13-01271
| Electrical Rough-In | 7/8/2013 | 7/10/2013 | 7/10/2013 9:40:48 AM | A | PASS |
|
|
underground - Dirk Phone #: ###-#### rough-in ok cover underground inside foundation, traffic path over trench ok
|
ELE13-01766
| Electrical Rough-In | 7/9/2013 | 7/10/2013 | 7/10/2013 9:13:09 AM | A | PASS |
|
|
wall rough in Phone #: ###-#### >> Inspection requested via web by Don Lustig rough-in ok cover walls
|
ELE13-01782
| Permanent Service | 7/9/2013 | 7/10/2013 | 7/10/2013 9:04:59 AM | A | PASS |
|
|
inspection for final and permanant service for cable tv power supply contact andy ###-#### . Phone #: ###-#### >> Inspection requested via web by andrew dopieralski p/s u/g n ok
|
ELE13-01782
| Final | 7/10/2013 | 7/10/2013 | 7/10/2013 9:03:42 AM | A | PASS |
|
|
job complete final ok
|
ELE13-01781
| Conference | 7/9/2013 | 7/10/2013 | 7/10/2013 8:47:46 AM | A | DONE |
|
|
Early as possible - Ivan Phone #: ###-#### Discussed with homeowner electrical requirements for krafting room addition.
|