Inspections for the day of: Wednesday, July 10, 2013.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00125 General Inspection7/10/20137/10/20137/11/2013 12:32:45 AM FAIL
Stabilization must be achieved on all portions of the project that are disturbed and have not achieved final stabilization.
MIS13-00196 ESC-Conference7/10/20137/10/20137/11/2013 12:23:25 AMAFAIL
Stop work order issued. Working without a valid esc permit. Project found to be outside of the ITD right a way. Must apply for for an ESC permit. Must check with Public Works with the city of Boise if their is any grading and drainage requirements. Prior to work continuing, a Site Preperation inspection must be complted to remove the stop work order. A special investigation fee was assessed to the project as well.
ESC12-01041 Aging Inspection7/10/20137/10/20137/11/2013 12:18:14 AM PASS
ESC12-00808 Aging Inspection7/10/20137/10/20137/11/2013 12:17:30 AM DONE
Permit finaled
ESC12-00147 General Inspection7/10/20137/10/20137/11/2013 12:17:00 AM PASS
ESC13-00323 General Inspection7/10/20137/10/20137/10/2013 5:05:03 PM PASS
ESC13-00013 General Inspection7/10/20137/10/20137/10/2013 2:08:53 PM PASS
ESC12-00808 DOC - Permit Finaled7/10/20137/10/20137/10/2013 2:08:19 PMPPASS
ESC12-01211 Aging Inspection7/10/20137/10/20137/10/2013 2:06:48 PM NR
ESC12-00539 General Inspection7/10/20137/10/20137/10/2013 2:06:08 PM PASS
ESC13-00327 General Inspection7/10/20137/10/20137/10/2013 2:05:48 PM PASS
ESC13-00291 General Inspection7/10/20137/10/20137/10/2013 2:05:27 PM FAIL
Verbal to RP:
Maintain washout area. Contain the mortar mixing area as well.
ESC11-00176 General Inspection7/10/20137/10/20137/10/2013 2:04:14 PM PASS
ESC12-01203 Aging Inspection7/10/20137/10/20137/10/2013 9:29:05 AM NR
ESC12-01154 Aging Inspection7/10/20137/10/20137/10/2013 9:16:02 AM DONE
permit finaled
ESC12-01154 DOC - Permit Finaled7/10/20137/10/20137/10/2013 9:15:38 AMPPASS
ESC13-00279 General Inspection7/10/20137/10/20137/10/2013 9:03:49 AM PASS
ESC13-00567 Site Preparation7/9/20137/10/20137/10/2013 8:17:51 AMAPART
Prior to pouring any concrete, must provide a concrete washout.