Inspections for the day of: Friday, July 10, 2020.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR20-00392 INSP-Sprinkler Rough-in7/10/20207/10/20207/10/2020 4:03:23 PMPPASS
Underground supply line is ok for cover.

, need approval to cover pipe Phone #: ###-#### Inspection requested via web by Katerina Spencer
BLD20-02212 FIRE-Final Inspection7/10/20207/10/20207/10/2020 4:03:22 PMPFAIL
Repair and test exit signs and emergency lights, provide additional fire extinguisher near the Dining area, remove dead bolt from the office door.

Dan - */Screened*/ Phone #: ###-####
FIR20-00168 INSP-Sprinkler Rough-in7/9/20207/10/20207/10/2020 12:59:05 PMACANC
Cancel per Richard Clark. is the contact. (: Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00779 INSP-Final Inspection7/9/20207/10/20207/10/2020 12:37:06 PMPFAIL
Need one of the sidewalls modified for height and interconnection with the FACP tested.

Call Anthony before heading out, backflow test scheduled to be completed before noon. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00902 INSP-Final Inspection7/10/20207/10/20207/10/2020 12:11:49 PMPFAIL
Need plan mods showing the communication method and the Sleeping area strobes need to meet NFPA 72 for the use of 110cd or 177cd as far as distance from ceiling as discussed. Need larger access to the east attic heat detector. Need the FACP shown upstairs instead of downstairs. Need to relocate or add a smoke detector in the basement as discussed. Plans show a PIV but none has been installed. See the city approved plans for corrections marked in red. No actual devices tested. Phone #: ###-#### Inspection requested via web by Robert Gobler
FIR20-00460 INSP-Final Inspection7/7/20207/10/20207/10/2020 11:48:27 AMAFAIL
Inspection was supposed to be for a rough-in. Need city approved drawings for inspection. I discussed the need for protection to be modified on both sides of the new wall and all ceilings re-installed.

SCREENED // Paul Phone #: ###-####
FIR20-00356 INSP-Sprinkler Rough-in/Hydro7/9/20207/10/20207/10/2020 10:10:12 AMAPASS
Rough-in passed. Overhead hydro witnessed with no pressure loss. No piping can be covered until a tenting inspection has been passed. Pump not installed yet and not inspected.

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-04004 FIRE-Final Inspection7/9/20207/10/20207/10/2020 9:52:43 AMAPASS
life safety passed. Fire alarm and fire sprinkler passed.
screened // Zach Phone #: ###-####
BLD19-00362 FIRE-Final Inspection7/8/20207/10/20207/10/2020 8:22:39 AMAPART
Temp for life safety until the new parking lot on norht side has been built/verified. All of the new school life safety items appear ok.

Troy *screened* Phone #: ###-####