Inspections for the day of: Thursday, July 11, 1996.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC96-00585 INSP - Final7/11/19967/11/19967/11/1996 12:00:00 AM PASS
/ / 337 - FRAM-OK FRAMING bldg 24 need to set roof top unit and process pipe inspection
MEC96-00587 INSP - Framing/ Rough-in7/11/19967/11/19967/11/1996 12:00:00 AM PASS
/ / 337 - bldg 24 gardian job RGHN-OK ROUGH IN
MEC96-01934 INSP - Retro Fit (check note)7/10/19967/11/19967/11/1996 12:00:00 AMAFAIL
07/11/96 337 - WH CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need combustion air
MEC96-01936 INSP - Final7/11/19967/11/19967/11/1996 12:00:00 AMPPASS
07/11/96 337 - REPLACE GAS PACK WITH NEW ONE FNL -OK FINAL
MEC96-01936 INSP - Final7/11/19967/11/19967/11/1996 12:00:00 AMPPASS
07/11/96 337 - REPLACE GAS PACK WITH NEW ONE FNL -OK FINAL
MEC96-01954 INSP - Gas pressure test7/11/19967/11/19967/11/1996 12:00:00 AMPNH
07/11/96 337 - *2020 TO ACCESS THE ISLAND GATE. PHONE ###-#### TO SPEAK MR.SMELEK UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
MEC96-01869 INSP - Duct work7/11/19967/11/19967/11/1996 12:00:00 AMPPASS
07/11/96 337 - FNL -OK FINAL
MEC96-00587 INSP - Framing/ Rough-in7/10/19967/11/19967/10/1996 12:00:00 AMACANC
07/10/96 337 - #24 AREA SOUTH EAST CORNER-CONTACT: ZENON LONG ###-####-F PLATFORM this inspection to be done the 11th
MEC96-00585 INSP - Final7/10/19967/11/19967/10/1996 12:00:00 AMACANC
07/10/96 337 - #24 FAB 4 YOU'VE BEEN OUT THERE ON THE R/I this inspection to be done the 11th
MEC96-00585 INSP - Final7/10/19967/11/19967/10/1996 12:00:00 AMACANC
07/10/96 337 - #24 FAB 4 YOU'VE BEEN OUT THERE ON THE R/I this inspection to be done the 11th