BLD96-00866
| INSP - Framing/Rough-in | 7/10/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | A | NR |
|
|
ELECT NOT DONE
|
BLD96-01306
| INSP - Footings | 7/10/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | A | NR |
|
|
|
BLD96-01797
| INSP - Footings | 7/10/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | A | FAIL |
|
|
POURED PIERS W/O INSP , PLANS NOT ON SITE FOR 2 OTHER POURS, LOOSE SOILS, STEPPED FTGS NOT ADDRESSED...ARCHITECT TOLD CONT. TO POUR ?
|
BLD96-01797
| INSP - Conference | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | PART |
|
|
Architect was on site and will get drawings etc to bldg dept
|
BLD96-00890
| INSP - Footings | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | NR |
|
|
|
BLD96-00890
| INSP - Foundation | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | PART |
|
|
APPROVED CHANGE IN FTG DESIGN AS PER ENGINEER'S CALCS AND DESIGN ON SITE
|
BLD96-00890
| INSP - Foundation | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | NR |
|
|
|
BLD96-00890
| INSP - Footings | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | PART |
|
|
2' FTGS OK
|
BLD96-00756
| INSP - Framing/Rough-in | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | FAIL |
|
|
class a roof required, hgr or pressure block truss heels, shr p/w
|
BLD96-00756
| INSP - Conference | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | PART |
|
|
met on site
|
BLD96-00866
| INSP - Conference | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | PART |
|
|
WENT OVER INSP PROCEDURE AGAIN
|
BLD96-00866
| INSP - Framing/Rough-in | 7/11/1996 | 7/11/1996 | 7/11/1996 12:00:00 AM | P | CANC |
|
|
CALLED BACK TO CANCEL PM AS WAS NOT YET READY
|