BLD97-00816
| INSP - Final | 7/9/1997 | 7/11/1997 | 7/12/1997 12:00:00 AM | P | CANC |
|
|
CANCELLED BY RANDY WILL RESCHEDULE
|
MEC97-01567
| INSP - Final | 7/10/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | CANC |
|
|
CANCELLED BY CAROL
|
MEC97-01567
| INSP - Final | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | PASS |
|
|
c/n will be completed for c/c structural final and will ck then
|
MEC97-01567
| INSP - Final | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | PASS |
|
|
c/n will be completed for c/c structural final and will ck then
|
MEC97-01567
| INSP - Final | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | FAIL |
|
|
|
MEC97-01567
| INSP - Final | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | FAIL |
|
|
|
MEC97-01567
| INSP - Final | 7/10/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | CANC |
|
|
CANCELLED BY CAROL
|
MEC97-01849
| INSP - Gas pressure test | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | PASS |
|
|
|
MEC97-01851
| INSP - Rough-in & Gas Pressure | 7/10/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | PASS |
|
|
|
BLD97-01306
| INSP - Framing/Rough-in | 7/10/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | A | PASS |
|
|
RE-INSPECTION
|
BLD97-01317
| INSP - Framing/Rough-in | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | FAIL |
|
|
no plan on site, no engineering, hand stack wrong, stairs wrong, bcec not done, $42 reinspection fee..
|
BLD97-01349
| INSP - Wall cover | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PASS |
|
|
|
MEC97-01858
| INSP - Rough-in & Gas Pressure | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PASS |
|
|
moving frplc stack out so more than 5' from 1 hour wall
|
MEC97-01858
| INSP - Rough-in & Gas Pressure | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PART |
|
|
MET SUPER ON SITE AND ASKED HIM TO DISCUSS 1 HOUR WALLS WITH BOB
|
BLD96-02800
| INSP - Wall cover | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PART |
|
|
pouring 7 yards of grout at 9 o'clock. has a special inspector on job site... no one on site in PM
|
BLD96-02800
| INSP - Footings | 7/7/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PART |
|
|
special inspector on site earlier, no one on site in PM
|
BLD96-03189
| INSP - Footings | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | NR |
|
|
poured w/Gary on site.. still waiting for letter of spec insp authorization.. still bolting together forms.. super wanted me to visually inspect wall pour.. asked him to schedule conf... We were not the problem for late pours!!
|
BLD96-03189
| INSP - Foundation | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PART |
|
|
2nd interior wall pour ok.. noted unsafe attachment of ladder to access top of forms.. will call safety 7/14
|
BLD97-00597
| INSP - Framing/Rough-in | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PART |
|
|
walls ok to cover
|
MEC97-01676
| INSP - Gas pressure test | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | NR |
|
|
NO ACCESS, NO ONE HOME, NO PRESSURE GAUGE ATTACHED
|
BLD97-01034
| INSP - Framing/Rough-in | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | NR |
|
|
no plan, engineering on site. no inspection performed
|
BLD97-01041
| INSP - Energy code compliance | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PASS |
|
|
|
BLD97-01041
| INSP - Framing/Rough-in | 7/11/1997 | 7/11/1997 | 7/11/1997 12:00:00 AM | P | PART |
|
|
still not as per engineering on front two straps in garage. Engineer to ascertain design as built.....
|